Scheduling of a multi-product polymer batch plant

被引:0
|
作者
Schulz, C [1 ]
Engell, S [1 ]
Rudolf, R [1 ]
机构
[1] Univ Dortmund, Proc Control Grp, D-44221 Dortmund, Germany
来源
THIRD INTERNATIONAL CONFERENCE ON FOUNDATIONS OF COMPUTER-AIDED PROCESS OPERATIONS | 1998年 / 94卷 / 320期
关键词
scheduling; multiproduct batch plants; mixed integer nonlinear programs (MINLP); nonconvex optimization;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, a real-world scheduling problem from the polymer industries is investigated. Special nonstandard features of the problem are the high degree of coupled production where none of the different products can be produced separately but their relative proportion can be influenced by the choice of the recipes, and that the discontinuous and the continuous part of the plant are connected by a mixing stage which gives rise to nonlinear relationships between the batches. Two different mathematical models are presented: a continuous-time and a fixed-grid model. Both models give rise to large, nonconvex, mixed integer nonlinear problems (MINLP). The size of the problems makes it impossible to use general purpose algorithms. We present scheduling algorithms which take the specific properties of the problem into account and lead to good suboptimal solutions. The two problem formulations are compared wrt. the computational effort required to compute the schedules.
引用
收藏
页码:224 / 230
页数:7
相关论文
共 50 条
  • [21] Multi-product lot sizing and scheduling on unrelated parallel machines
    Dolgui, Alexandre
    Eremeev, Anton V.
    Kovalyov, Mikhail Y.
    Kuznetsov, Pavel M.
    IIE TRANSACTIONS, 2010, 42 (07) : 514 - 524
  • [22] Planning of multi-product pipelines by economic lot scheduling models
    Kirschstein, Thomas
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (01) : 327 - 339
  • [23] A continuous-time formulation for scheduling multistage multi-product batch plants with non-identical parallel units
    Liu, Y
    Karimi, IA
    European Symposium on Computer-Aided Process Engineering-15, 20A and 20B, 2005, 20a-20b : 1165 - 1170
  • [24] A hybrid heuristic and linear programming approach to multi-product machine scheduling
    Goncalves, JF
    Leachman, RC
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 110 (03) : 548 - 563
  • [25] A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants with sequence-dependent constraints
    Hui, CW
    Gupta, A
    van der Meulen, HAJ
    COMPUTERS & CHEMICAL ENGINEERING, 2000, 24 (12) : 2705 - 2717
  • [26] Multi-period scheduling of a multi-stage multi-product bio-pharmaceutical process
    Kabra, Shaurya
    Shaik, Munawar A.
    Rathore, Anurag S.
    COMPUTERS & CHEMICAL ENGINEERING, 2013, 57 : 95 - 103
  • [27] Synchronization in common cycle lot size scheduling for a multi-product serial supply chain
    Hoque, MA
    Kingsman, BG
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (01) : 316 - 331
  • [28] Multi-product scheduling through process mining: bridging optimization and machine process intelligence
    Alexandre Checoli Choueiri
    Eduardo Alves Portela Santos
    Journal of Intelligent Manufacturing, 2021, 32 : 1649 - 1667
  • [29] Multi-product scheduling through process mining: bridging optimization and machine process intelligence
    Choueiri, Alexandre Checoli
    Portela Santos, Eduardo Alves
    JOURNAL OF INTELLIGENT MANUFACTURING, 2021, 32 (06) : 1649 - 1667
  • [30] An efficient GRASP-like algorithm for the multi-product straight pipeline scheduling problem
    Bamoumen, Meryem
    Elfirdoussi, Selwa
    Ren, Libo
    Tchernev, Nikolay
    COMPUTERS & OPERATIONS RESEARCH, 2023, 150