Void Prediction of Cement Concrete Overly on Old Cement Pavement after Rubblization
被引:1
作者:
Zhang, Yong-ping
论文数: 0引用数: 0
h-index: 0
机构:
Hang Zhou Highway Adm Bur, Hangzhou 301103, Zhejiang, Peoples R ChinaHang Zhou Highway Adm Bur, Hangzhou 301103, Zhejiang, Peoples R China
Zhang, Yong-ping
[1
]
Meng, Xian-jin
论文数: 0引用数: 0
h-index: 0
机构:
Changan Univ, Sch Highway, Xian 710064, Shanxi, Peoples R ChinaHang Zhou Highway Adm Bur, Hangzhou 301103, Zhejiang, Peoples R China
Meng, Xian-jin
[2
]
机构:
[1] Hang Zhou Highway Adm Bur, Hangzhou 301103, Zhejiang, Peoples R China
[2] Changan Univ, Sch Highway, Xian 710064, Shanxi, Peoples R China
来源:
DEVELOPMENT OF INDUSTRIAL MANUFACTURING
|
2014年
/
525卷
关键词:
old cement concrete pavement;
rubblization;
overlay;
void beneath slab;
prediction;
D O I:
10.4028/www.scientific.net/AMM.525.457
中图分类号:
TE [石油、天然气工业];
TK [能源与动力工程];
学科分类号:
0807 ;
0820 ;
摘要:
Void is a major disease of cement concrete pavement, and it is also the inducement of other diseases. In order to predict the void, this paper quantificational analyzes the relationship between the times of load function and the lost of materials caused by erosion based on the analysis of the shape and height of void. And then it puts forward that the volume of the lost of materials caused by erosion is equal to the void under slab and gets the prediction models of voids beneath slab corner and along longitudinal joint edge. The results suggest that when the void height is less than side length, the prediction model of void beneath slab corner is same to the along longitudinal joint edge. The development of the void only has relationships with the anti-scour performance of the base course material, the ratio of height and size of void, and the times of standard axle load.
引用
收藏
页码:457 / +
页数:2
相关论文
共 4 条
[1]
QIU Li-zhang, 2007, CENTRAL S HIGHWAY EN, V32, p106_108
[2]
TAN Zhi-ming, 2008, CHINESE J HYDRODYNAM, V23, P281