Scheduling Multiple Groups of Jobs for a Multi-Line Steel Hot Rolling Mill

被引:1
|
作者
Kowalski, M. [1 ]
Steinboeck, A. [1 ]
Kugi, A. [1 ,2 ]
机构
[1] TU Wien, Automat & Control Inst, Gusshausstr 27-29, A-1040 Vienna, Austria
[2] Austrian Inst Technol AIT, Ctr Vis Automat & Control, Giefinggasse 4, A-1210 Vienna, Austria
来源
IFAC PAPERSONLINE | 2022年 / 55卷 / 21期
关键词
Production planning and control; multi-line hot rolling mill; job shop; sequence dependent setup times; traveling salesman problem; orienteering problem; heuristic algorithm; simulated annealing; ALGORITHM;
D O I
10.1016/j.ifacol.2022.09.262
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This work addresses the optimal scheduling for a multi-line steel hot rolling mill with two parallel production lines. Groups of products are manufactured at one of these lines in an alternate sequence. An optimal schedule minimizes the sum of the required setup times between all products and optimally fills up retooling times necessary at one line by processing a group of products at the other line. This requires both sequence optimization and, for some groups, the optimal selection of jobs. The optimization problem is a combination of traveling salesman and orienteering problems and considers all groups simultaneously. To iteratively solve the combined problem, an algorithm consisting of a heuristic simulated annealing and a local search procedure is employed. The effectiveness of the algorithm is analyzed in a case study. Copyright (C) 2022 The Authors.
引用
收藏
页码:168 / 173
页数:6
相关论文
共 8 条
  • [1] Job Scheduling for a Multi-Line Steel Hot Rolling Mill With Selectable Furnaces
    Kowalski, M.
    Kugi, A.
    Steinboeck, A.
    IFAC PAPERSONLINE, 2023, 56 (02): : 5376 - 5381
  • [2] Evaluating Decomposition Strategies to Enable Scalable Scheduling for a Real-World Multi-line Steel Scheduling Problem
    Adham, Manal T.
    Bentley, Peter J.
    Diaz, Diego
    2017 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2017, : 3130 - 3137
  • [3] Multi-line hybrid flow-shop scheduling problem with energy considerations
    Taguemount, Sara
    Lamy, Damien
    Delorme, Xavier
    Casoetto, Nicolas
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024,
  • [4] Multi-objective optimization for draft scheduling of hot strip mill
    Li Wei-gang
    Liu Xiang-hua
    Guo Zhao-hui
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2012, 19 (11) : 3069 - 3078
  • [5] Integrated problem of soaking pit heating and hot rolling scheduling in steel plants
    Li, Feng
    Zhang, Yanyan
    Wei, Han
    Lai, Xiaofan
    COMPUTERS & OPERATIONS RESEARCH, 2019, 108 : 238 - 246
  • [6] Research and application of multiple constrained hot strip mill scheduling problem based on HPSA
    Liu, Lilan
    Liu, Chao
    Liu, Xuewei
    Wang, Sen
    Zhou, Wei
    Zhang, Zhenyou
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12) : 1817 - 1829
  • [7] Very Large-Scale Neighborhood Search for Steel Hot Rolling Scheduling Problem With Slab Stack Shuffling Considerations
    Shi, Yarong
    Liu, Shixin
    IEEE ACCESS, 2021, 9 : 47856 - 47863
  • [8] Fault Location of Strip Steel Surface Quality Defects on Hot-Rolling Production Line Based on Information Fusion of Historical Cases and Process Data
    Wang, Zhaoping
    Wang, Jian
    Chen, Sen
    IEEE ACCESS, 2020, 8 : 171240 - 171251