An optimal replacement policy for repairable cold standby system with priority in use

被引:9
|
作者
Wang, Guan Jun [1 ]
Zhang, Yuan Lin [1 ]
机构
[1] SE Univ, Dept Math, Nanjing 210018, Peoples R China
关键词
renewal process; geometric process; priority; replacement policy; renewal reward theorem; convolution; Weibull distribution;
D O I
10.1080/00207720701655395
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this article, a cold standby repairable system consisting of two nonidentical components and one repairman is studied. It is assumed that component 2 after a repair is "as good as new'' while component 1 after a repair is not, but component 1 is given priority in use. Under these assumptions, by using the geometric process repair model, we consider a replacement policy N based on the number of failures of component 1 under which the system is replaced when the number of failures of component 1 reaches N. Our problem is to determine an optimal policy N* such that the long-run average cost per unit time (i. e. the average cost rate) of the system is minimized. The explicit expression of the average cost rate of the system is derived and the corresponding optimal replacement policy N* can be determined numerically. Finally, a special system with Weibull-distributed working time and repair time of component 1 is given to illustrate the theoretical results in this article.
引用
收藏
页码:1021 / 1027
页数:7
相关论文
共 50 条
  • [1] A Bivariate Optimal Replacement Policy for a Cold Standby Repairable System with Repair Priority
    Leung, Kit Nam Francis
    Zhang, Yuan Lin
    Lai, Kin Keung
    NAVAL RESEARCH LOGISTICS, 2010, 57 (02) : 149 - 158
  • [2] An optimal repair-replacement policy for a cold standby system with use priority
    Zhang, Yuan Lin
    Wang, Guan Jun
    APPLIED MATHEMATICAL MODELLING, 2011, 35 (03) : 1222 - 1230
  • [3] Replacement Policy for Cold Standby Repairable System with Priority in Use by Using Arithmetico-Geometric Process
    Latpate, Raosaheb, V
    Thorve, Babasaheb K.
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2020, 27 (03)
  • [4] A deteriorating cold standby repairable system with priority in use
    Zhang, Yuan Lin
    Wang, Guan Jun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (01) : 278 - 295
  • [5] A bivariate optimal replacement policy for a cold standby repairable system with preventive repair
    Wang, Guan Jun
    Zhang, Yuan Lin
    APPLIED MATHEMATICS AND COMPUTATION, 2011, 218 (07) : 3158 - 3165
  • [6] Optimal Replacement Policy for Cold Standby System
    TAN Lin~(1
    Chinese Journal of Mechanical Engineering, 2011, 24 (02) : 316 - 322
  • [7] Optimal Replacement Policy for Cold Standby System
    Tan Lin
    Yang Jian
    Cheng Zhijun
    Guo Bo
    CHINESE JOURNAL OF MECHANICAL ENGINEERING, 2011, 24 (02) : 316 - 322
  • [8] Optimal replacement policy for a two-component cold standby system with repair priority
    Leung, K. N. F.
    Zhang, Y. L.
    Lai, K. K.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2010, 224 (B6) : 963 - 970
  • [9] Replacement policy of cold standby repairable system with single repairman vacation
    Tan, Lijiao
    Meng, Xianyun
    Liu, Wenjuan
    Zhang, Xinxin
    Chen, Shengqiang
    Journal of Computational Information Systems, 2013, 9 (19): : 7695 - 7702
  • [10] Replacement problems for a cold standby repairable system
    Zhang, YL
    Wang, GJ
    Ji, ZC
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2006, 37 (01) : 17 - 25