The Impact of Existing Building Commissioning Measures on Peak Electric Demand

被引:0
|
作者
Morsy, Ahmed [1 ]
Williams, Walter [3 ,4 ]
Claridge, David E. [2 ]
机构
[1] Texas A&M Univ, Dept Mech Engn, College Stn, TX 77843 USA
[2] Energy Syst Lab ESL, College Stn, TX USA
[3] Texas A&M Univ, Mech Engn, College Stn, TX USA
[4] Tarrant Cty Coll Dist, Ft Worth, TX USA
来源
ASHRAE TRANSACTIONS 2022, VOL 128, PT 2 | 2022年 / 128卷
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper investigates the independent impact of several different existing building commissioning (EBCx) measures on peak electric demand, to help understand measures to prioritize based on peak demand savings along with the usually-assessed energy consumption savings. The investigation involves developing separate EnergyPlusT models for each EBCx measure, and comparing the peak electric demand generated by each model with a baseline model. The pre-EBCx and post-EBCx models are based on a community college campus which underwent an EBCx project between 2014 and 2015, resulting in an average of 34% savings in energy consumption and peak demand. The total peak demand reduction determined from the individual EBCx measures was only 26% compared to the measured reduction of 34%. Applying an outside air temperature reset schedule to AHUs' supply air temperature (SAT) setpoints reduced peak demand by an average of 16.7%, mainly due to the reduction of unnecessary cooling and reheating, especially in winter. The optimization of AHU control schedules, which minimized the unnecessary operation of some units during peak hours produced peak demand savings of 6%, while the optimization of space temperature setpoints contributed another 3%. While other measures impact electric demand during non-peak hours, none produced peak electric demand reduction greater than 1%. Other measures did not generate peak demand savings while still generating energy consumption savings, mainly for the reason of not having an impact during peak hours.
引用
收藏
页码:492 / 501
页数:10
相关论文
共 50 条
  • [1] The Impact of Existing Building Commissioning on Electric Peak Demand
    Morsy, Ahmed
    Williams, Walter H., III
    Claridge, David E.
    ASHRAE TRANSACTIONS 2021, VOL 128, PT 1, 2022, 128 : 541 - 549
  • [2] Existing building commissioning
    Poulos, Jim
    ASHRAE JOURNAL, 2007, 49 (09) : 66 - +
  • [3] Existing Building Commissioning
    Friedman, Glenn
    ASHRAE JOURNAL, 2010, 52 (12) : 10 - 10
  • [4] The energy savings impact of the existing building commissioning process by building type
    Ruffin, Alaina
    Claridge, David E.
    Baltazar, Juan-Carlos
    SCIENCE AND TECHNOLOGY FOR THE BUILT ENVIRONMENT, 2021, 27 (10) : 1505 - 1521
  • [5] Existing Building Commissioning at a Community College
    Madden, Luke A.
    Yagua, Carlos
    Schroeder, Fred L.
    Baltazar, Juan-Carlos
    Claridge, David E.
    Williams, Walter H.
    Hoelke, David
    ASHRAE TRANSACTIONS 2020, VOL 126, PT 1, 2020, 126 : 883 - 894
  • [6] Improvements to a Methodology for Estimating Potential Energy Savings from Existing Building-Commissioning/Retrofit Measures
    Liu, Jingjing
    Baltazar, Juan-Carlos
    Claridge, David E.
    ASHRAE: TRANSACTIONS 2011, VOL 117, PT 1, 2011, 117 : 868 - 883
  • [7] OTHER INSTITUTIONAL, EXISTING BUILDING COMMISSIONING Vivarium Retrocommissioning
    Wheeler, Adam
    ASHRAE JOURNAL, 2017, 59 (10) : 36 - 48
  • [8] EVALUATION OF THE SEISMIC DEMAND OF AN EXISTING TALL BUILDING
    Bilotta, Antonio
    Tomeo, Romeo
    Nigro, Emidio
    Manfredi, Gaetano
    INGEGNERIA SISMICA, 2018, 35 (01): : 67 - 87
  • [9] Visualizing building energy demand for building peak energy analysis
    Yarbrough, I.
    Sun, Q.
    Reeves, D. C.
    Hackman, K.
    Bennett, R.
    Henshel, D. S.
    ENERGY AND BUILDINGS, 2015, 91 : 10 - 15
  • [10] Seasonal models of peak electric load demand
    Ahmed, S
    TECHNOLOGICAL FORECASTING AND SOCIAL CHANGE, 2005, 72 (05) : 609 - 622