Investigation of the Youjiang active fault zone and a preliminary study of its impact on the planned Huaneng Baise Power Plant

被引:0
作者
He, Qingyu [1 ,2 ]
Yan, Changhong [1 ]
Xu, Baotian [1 ]
Sun, Qian [1 ]
机构
[1] Nanjing Univ, Sch Earth Sci & Engn, 163 Xianlin Rd, Nanjing 210023, Jiangsu, Peoples R China
[2] Guangxi Univ Finance & Econ, Nanning, Guangxi, Peoples R China
关键词
Power plant; Environmental geotechnical engineering; Geological structure; Active fault zone; Moniliform spring head; High-density resistivity method; Seismic safety assessment; STABILITY ANALYSIS;
D O I
10.1007/s12665-016-6055-x
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Along with the rapid development of the Chinese economy, there is an increasing demand for power consumption in southern China. The China Huaneng Group plans to build the Huaneng Baise Power Plant in the Baise region of Guangxi Province. The plant site is located in Baise City, Tianyang County, and is close to the Youjiang fault zone, which is an active fault zone. To investigate the impact of the active fault zone on the planned power plant, the geographical distribution of the fault zone and its relationship to the plant site should be further clarified. Because the plant site is covered by a Quaternary overburden layer and the Youjiang fault zone is concealed beneath the layer, the geographical relationship between the Youjiang fault zone and the plant site is difficult to determine. This paper reports on a comprehensive investigation using multiple approaches, including drilling, geophysical prospecting and a geological survey. By searching the moniliform spring heads and comparing strata variations and topographic changes between the foot wall and the hanging wall of the active fault zone, the location and trend of the Youjiang active fault zone were determined. The characteristics of this fault zone were further analyzed using high-density resistivity measurements and seismic imaging. Preliminary studies were conducted on the impact of the Youjiang active fault zone on the planned Huaneng Baise Power Plant, which provide an important basis for seismic safety assessment and also a significant reference for a feasibility study of the power plant. This investigation is a part of The Feasibility Study Project of Huaneng Baise Power Plant.
引用
收藏
页数:18
相关论文
共 11 条
  • [1] [Anonymous], 2008, 45F230A01 GUANGX EL
  • [2] [Anonymous], 2001, 45F128KG0101 GUANGX
  • [3] Arrdal IB, 2007, THESIS
  • [4] Chen H.W., 1988, HYDRAULIC FILL STRUC, V21, P430
  • [5] China Earthquake Administration, 2008, AN CAUS THEM8 0 WENC
  • [6] Geotechnical Characteristics of Copper Mine Tailings: A Case Study
    Shamsai, Abolfazl
    Pak, Ali
    Bateni, S.
    Ayatollahi, S.
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2007, 25 (05) : 591 - 602
  • [7] Stability analysis of the Lingshan gold mine tailings dam under conditions of a raised dam height
    Xu, Baotian
    Wang, Yuying
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2015, 74 (01) : 151 - 161
  • [8] Seismic Stability Analysis of the Yanghuya Fly Ash Tailings Dam
    Xu, Baotian
    Lu, Qiushen
    He, Donglin
    [J]. ENVIRONMENTAL & ENGINEERING GEOSCIENCE, 2014, 20 (04) : 371 - 391
  • [9] An Experimental Study of the Mechanical Behavior of a Weak Intercalated Layer
    Xu, Baotian
    Yan, Changhong
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2014, 47 (02) : 791 - 798
  • [10] Zhou JM, 2000, CHIN J ROCK MECH ENG, V19, P853