INITIAL DESIGN AND ANALYSIS OF A COMPRESSED NATURAL GAS TRANSPORT SYSTEM

被引:0
作者
Yin, Decao [1 ]
Ludvigsen, Halgeir [1 ]
Lie, Halvor [1 ]
Fylling, Ivar [1 ]
机构
[1] SINTEF Ocean Trondheim, Trondheim, Norway
来源
PROCEEDINGS OF ASME 2021 40TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING (OMAE2021), VOL 4 | 2021年
基金
欧盟地平线“2020”;
关键词
D O I
暂无
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Offloading hoses/flexible pipes are used to transfer compressed natural gas (CNG) from an intermediate floating storage and offloading unit (FSO) to CNG vessel (GASVESSEL). The floating hoses are subjected to environmental loads that are mainly waves, current, and vessel motions from both the FSO and the CNG vessel. Preliminary design of loading/unloading system and dynamic positioning system has been performed. Dynamic analysis of the loading/offloading hose and positioning analysis of the FSO and CNG vessel have been carried out numerically in this study. It is verified that the designed loading/unloading system and positioning system of the two vessels (FSO and CNG vessel) are able to operate safely under the sea-state H-s = 6 m within the defined ESD1 zone.
引用
收藏
页数:9
相关论文
共 29 条
[1]  
API, 2008, Design and analysis of stationkeeping systems for floating units. API recommended practice 2SK
[2]  
Chen H., 2003, THESIS NORWEGIAN U S
[3]  
DNVGL, 2015, DNVOSE403 DNVGL
[4]  
DNVGL, 2015, RUL CLASS SHIPS 6
[5]  
DNVGL, 2016, DNVOSE301 DNVGL
[6]  
Dong Y, 2017, RISK, RELIABILITY AND SAFETY: INNOVATING THEORY AND PRACTICE, P166
[7]  
Droushiotis N., 2018, GASVESSEL DELIVERABL
[8]  
Eurostat, 2019, EU IMP EN PROD REC D
[9]  
GASVESSEL, 2020, US
[10]  
Hals T., 2004, DYNAMIC POSITIONING