Key Challenges in Megabridge Design-Build Project Procurement

被引:2
作者
Moran, Raymond M. [1 ]
Odeh, Ibrahim [1 ]
Ashuri, Baabak [2 ,3 ,4 ]
机构
[1] Columbia Univ, Dept Civil Engn & Engn Mech, 500 W 120th St, New York, NY 10027 USA
[2] Brook Byers Inst Sustainable Syst BBISS, Atlanta, GA USA
[3] Georgia Inst Technol, Econ Sustainable Syst Built Environm ESBE Lab, Sch Bldg Construct, 280 Ferst Dr, Atlanta, GA 30332 USA
[4] Georgia Inst Technol, Sch Civil & Environm Engn, 280 Ferst Dr, Atlanta, GA 30332 USA
关键词
SELECTION;
D O I
10.1061/(ASCE)LA.1943-4170.0000516
中图分类号
D9 [法律]; DF [法律];
学科分类号
0301 ;
摘要
Megabridge projects are those that cost more than $500 million to complete from the planning stages through completion of construction. In the evolving field of transportation design-build (DB) project delivery, it is imperative that the procurement process provide selection criteria that aligns with the needs and the expectations of the owner while providing the proposers with a clear path toward project award and delivery. This study employed in-depth interviews and case studies to ascertain areas of weakness in the procurement process. To obtain a deeper understanding of these weaknesses, we developed a survey limited to responses from transportation design-build subject matter experts. It is evident through this study that five key challenges exist: (1) design-build megabridge project procurements are unique; (2) transparency of technical scoring criteria and assigned weight need improvement; (3) there are misalignments in identification of major criteria versus weight of criteria; (4) key criteria differ from more typically sized projects; and (5) price is viewed by proposers as the top scoring criteria. These challenges can hinder respondents' ability to fully utilize the potential of design-build. This research is the first study to identify key challenges in project procurement and request for proposal (RFP) development in the context of megabridge projects within the transportation DB industry. The findings presented in this paper provide a better understanding of key challenges in project procurement and provides insight into potential opportunities for improvement. Further transparency in RFP scoring could lead to RFPs and proposals with reduced possibilities for selection protests while maximizing the benefits of design-build project delivery. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 24 条
[1]  
ASCE, 2021, REP CARD AM INFR 202
[2]  
ASCE (American Society of Civil Engineers), 2017, Report card for America's infrastructure 2017
[3]  
Ashuri B., 2012, RP1023 GEORG DOT
[4]   Time and Cost Performance of Design-Build Projects [J].
Chen, Qing ;
Jin, Zhigang ;
Xia, Bo ;
Wu, Peng ;
Skitmore, Martin .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (02)
[5]   Anatomy of Construction Disputes [J].
Cheung, Sai On ;
Pang, Karen Hoi Yan .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (01) :15-23
[6]  
DBIA (Design Build Institute of America), 2014, DES BUILD DON RIGHT
[7]   Comparative analysis of owner goals for design/build projects [J].
del Puerto, Carla Lopez ;
Gransberg, Douglas D. ;
Shane, Jennifer S. .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2008, 24 (01) :32-39
[8]   Analysis of federal design-build request for proposal evaluation criteria [J].
Gransberg, Douglas D. ;
Barton, Ronald F. .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2007, 23 (02) :105-111
[9]   Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods [J].
Hale, Darren R. ;
Shrestha, Pramen P. ;
Gibson, G. Edward, Jr. ;
Migliaccio, Giovanni C. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (07) :579-587
[10]   Impact of Owners' Early Decisions on Project Performance and Dispute Occurrence in Public Highway Projects [J].
Hasanzadeh, Sogand ;
Esmaeili, Behzad ;
Nasrollahi, Samaneh ;
Gad, Ghada M. ;
Gransberg, Douglas D. .
JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2018, 10 (02)