共 50 条
- [41] Risk Evaluation on Ship Navigation System Based on Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation Method PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 3944 - 3948
- [42] Risk Evaluation System of Utility Tunnel PPP Project Research Based on Fuzzy Comprehensive Evaluation Method PROCEEDINGS OF THE 2017 INTERNATIONAL CONFERENCE ON INNOVATIONS IN ECONOMIC MANAGEMENT AND SOCIAL SCIENCE (IEMSS 2017), 2017, 29 : 550 - 555
- [44] Processing Method for Transaction Settlement Bias Power Based on Fuzzy Comprehensive Evaluation Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (03): : 200 - 204and215
- [45] Comprehensive Evaluation of Thermal Power Denitration Project Based on Fuzzy AHP Method 2014 INTERNATIONAL CONFERENCE ON ENVIRONMENTAL POLLUTION AND PUBLIC HEALTH (EPPH 2014), VOL 3, 2014, 3 : 67 - 72
- [46] Evaluation of Innovation Effect of Residential Design Based on Fuzzy Comprehensive Evaluation Method ADVANCES IN ENGINEERING DESIGN AND OPTIMIZATION, PTS 1 AND 2, 2011, 37-38 : 407 - 411
- [47] Evaluation of Highway Maintenance Machinery Configuration Based on Fuzzy Comprehensive Evaluation Method MECHATRONICS AND INTELLIGENT MATERIALS II, PTS 1-6, 2012, 490-495 : 319 - 324
- [48] Evaluation of the ecological environment in mining areas based on fuzzy comprehensive evaluation method LAND RECLAMATION IN ECOLOGICAL FRAGILE AREAS, 2017, : 101 - 103
- [50] The Evaluation of the Water Quality of Shenwo Reservoir Based on Fuzzy Comprehensive Evaluation Method ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 2061 - 2065