A hybrid cuckoo search algorithm in parallel batch processing machines with unequal job ready times

被引:22
|
作者
Majumder, Arindam [1 ]
Laha, Dipak [1 ]
Suganthan, P. N. [2 ]
机构
[1] Jadavpur Univ, Dept Mech Engn, Kolkata, India
[2] Nanyang Technol Univ, Sch Elect & Elect Engn, Singapore, Singapore
关键词
Scheduling; Parallel batch processing machines; Makespan; Cuckoo search algorithm; Variable neighborhood search; Optimization; VARIABLE NEIGHBORHOOD SEARCH; ANT COLONY OPTIMIZATION; MINIMIZING MAKESPAN; FLOW-SHOP; HEURISTICS; DESIGN; SIZES;
D O I
10.1016/j.cie.2018.07.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper deals with the problem of scheduling identical parallel batch processing machines. In this scheduling system, each machine processes a set of jobs in a batch simultaneously and each job in the batch is characterized by its processing time, ready time and job size. We propose a hybrid discrete cuckoo search (HDCS) algorithm to minimize makespan for this scheduling problem. The HDCS is constructed, based on a modified variable neighborhood search and cuckoo search algorithm. In the proposed algorithm, we present a modified Levy flight in the cuckoo search to transform a continuous position in the HDCS into a discrete schedule for generating a new solution. The process parameters of the proposed HDCS are tuned by implementing the desirability-based Taguchi method to optimize both solution quality and run time. The results of exhaustive computational experimentation on a large number of randomly generated sparse as well as non-sparse problem instances show that the proposed algorithm is more effective and efficient than the state-of-the-art algorithms.
引用
收藏
页码:65 / 76
页数:12
相关论文
共 50 条
  • [1] A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times
    Damodaran, Purushothaman
    Velez-Gallego, Mario C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (01) : 1451 - 1458
  • [2] Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times
    Damodaran, Purushothaman
    Velez-Gallego, Mario C.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (9-12): : 1119 - 1128
  • [3] Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times
    Purushothaman Damodaran
    Mario C. Velez-Gallego
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 1119 - 1128
  • [4] A Hybrid Differential Evolution Algorithm for Scheduling Parallel Batch Processing Machine with Unequal Job Ready Times
    Jafari, Azizollah
    Hassani, Somayeh
    Chiniforooshan, Payam
    WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, WCECS 2012, VOL II, 2012, : 1421 - 1426
  • [5] Cuckoo Search on Parallel Batch Processing Machines
    Majumder, Arindam
    Laha, Dipak
    PROGRESS IN ADVANCED COMPUTING AND INTELLIGENT ENGINEERING, PROCEEDINGS OF ICACIE 2016, VOLUME 1, 2018, 563 : 645 - 653
  • [6] Scheduling unrelated parallel batch processing machines with non-identical job sizes and unequal ready times
    Arroyo, Jose Elias C.
    Leung, Joseph Y. -T.
    COMPUTERS & OPERATIONS RESEARCH, 2017, 78 : 117 - 128
  • [7] Meta-heuristic algorithms for scheduling on parallel batch machines with unequal job ready times
    Fidelis, Michele B.
    Arroyo, Jose Elias C.
    2017 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2017, : 542 - 547
  • [8] Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
    Mönch, L
    Balasubramanian, H
    Fowler, JW
    Pfund, ME
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (11) : 2731 - 2750
  • [9] Efficient algorithms to minimize makespan of the unrelated parallel batch-processing machines scheduling problem with unequal job ready times
    Zarook, Yaser
    Rezaeian, Javad
    Mahdavi, Iraj
    Yaghini, Masoud
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (03) : 1501 - 1522
  • [10] Iterated Local Search for Unrelated Parallel Machines Problem with Unequal Ready Times
    Chen, Chun-Lung
    2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2008, : 2044 - 2047