Risk Analysis of Tunnel Shield Machine Driving-in and Driving-out Construction Process in Zhengzhou Subway Engineering

被引:0
|
作者
Qiao, Jingshun [1 ]
Yang, Delei [1 ]
Liu, Huawei [1 ]
Guo, Haizhu [2 ]
Liu, Lingyun [1 ]
Jia, Zhigang [1 ]
机构
[1] Huanghuai Univ, Dept Bldg Engn, Zhumadian 463000, Peoples R China
[2] Shenzhen Metro Ltd, Shenzhen 518026, Peoples R China
来源
CHINESE PERSPECTIVE ON RISK ANALYSIS AND CRISIS RESPONSE | 2010年 / 13卷
关键词
tunneling engineering; expert investigation method; analytical hierarchy process; risk analysis;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Tunnel shield machine driving-in and driving-out construction process in tunneling engineering brings more risks. Based on Zhengzhou Metro M1 line project, the risk analysis method is presented in the paper, which evaluates risk level of working condition using expert investigation method and evaluates weights of the risk factors using analytical hierarchy process. Risk of tunneling machine driving-in and driving-out construction process is analyzed. Risk control measures are put forward based on the results of risk analysis.
引用
收藏
页码:879 / +
页数:2
相关论文
共 1 条
  • [1] Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No.2
    Eskesen, SD
    Tengborg, P
    Kampmann, J
    Veicherts, TH
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2004, 19 (03) : 217 - 237