A Simulation Model of Construction Projects Executed in Random Conditions with the Overlapping Construction Works

被引:7
作者
Biruk, Slawomir [1 ]
Rzepecki, Lukasz [1 ]
机构
[1] Lublin Univ Technol, Fac Civil Engn & Architecture, 40 Nadbystrzycka St, PL-20618 Lublin, Poland
关键词
civil engineering; construction project management; construction scheduling; random conditions; simulation method; CRITICAL PATH; DESIGN; SUSTAINABILITY; CONTINUITY; DURATION;
D O I
10.3390/su13115795
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Reducing the duration of construction works requires additional organizational measures, such as selecting construction methods that assure a shorter realization time, engaging additional resources, working overtime, or allowing construction works to be performed simultaneously in the same working units. The simultaneous work of crews may affect the quality of works and the efficiency of construction processes. This article presents a simulation model aimed at assessing the impact of the overlap period on the extension of the working time of the crews and the reduction of a repetitive project's duration in random conditions. The purpose of simulation studies is to provide construction managers with guidelines when deciding on the dates of starting the sequential technological process lines realized by specialized working crews, for sustainable scheduling and organization of construction projects.
引用
收藏
页数:13
相关论文
共 48 条
[1]  
[Anonymous], 2000, A guide to the project management body of knowledge
[2]  
[Anonymous], 2002, International Series in Operations Research and Management Science
[3]   Cost approach to the flow-shop construction scheduling [J].
Anysz, Hubert ;
Krzeminski, Michal .
INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2018: BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2019, 110
[4]   Risk of Delays in Implementation of Building Investment in Urban Conditions in the Aspect of Historical Background of its Location [J].
Apollo, Magdalena ;
Grzyl, Beata ;
Jakubowicz, Pawel .
3RD WORLD MULTIDISCIPLINARY CIVIL ENGINEERING, ARCHITECTURE, URBAN PLANNING SYMPOSIUM (WMCAUS 2018), 2019, 471
[5]  
Ark O.A., 2019, Int. J. Optim. Control Theor. Appl, V9, P208, DOI [10.11121/ijocta.01.2019.00631, DOI 10.11121/IJOCTA.01.2019.00631]
[6]   Modelling the boundaries of project fast-tracking [J].
Ballesteros-Perez, Pablo .
AUTOMATION IN CONSTRUCTION, 2017, 84 :231-241
[7]  
Berthaut F, 2011, PROCEEDINGS OF INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM'2011): INNOVATIVE APPROACHES AND TECHNOLOGIES FOR NETWORKED MANUFACTURING ENTERPRISES MANAGEMENT, P299
[8]   Scheduling Linear Construction Projects with Constraints on Resource Availability [J].
Biruk, S. ;
Jaśkowski, P. .
Archives of Civil Engineering, 2017, 63 (01) :3-15
[9]   Selection of the Optimal Actions for Crashing Processes Duration to Increase the Robustness of Construction Schedules [J].
Biruk, Slawomir ;
Jaskowski, Piotr .
APPLIED SCIENCES-BASEL, 2020, 10 (22) :1-14
[10]   Simulation model for resource-constrained construction project [J].
Biruk, Slawomir ;
Rzepecki, Lukasz .
OPEN ENGINEERING, 2019, 9 (01) :211-217