Interval Double-Sided Fuzzy Chance-Constrained Programming Model for Water Resources Allocation

被引:7
作者
Cheng, Haichun [1 ]
Li, Yongping [2 ,3 ]
Sun, Jie [1 ]
机构
[1] North China Elect Power Univ, MOE Key Lab Resources & Environm Syst Optimizat, Beijing, Peoples R China
[2] Beijing Normal Univ, Sch Environm, State Key Lab Water Environm, Beijing 100875, Peoples R China
[3] Univ Regina, Inst Energy Environm & Sustainable Commun, Regina, SK, Canada
关键词
chance-constrained; decision-making; fuzzy sets; multisource; uncertainty; water resources; OPTIMIZATION MODEL; MANAGEMENT; RESERVOIR; SYSTEM; SCALE;
D O I
10.1089/ees.2017.0205
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this study, an interval double-sided fuzzy chance-constrained programming (IDFCP) approach is developed for identifying water resources allocation strategies under uncertainty. Through incorporating interval parameter programming, double-sided fuzzy programming, and chance-constrained programming into a general framework, IDFCP can effectively deal with uncertainties expressed as intervals, probability distributions, and fuzzy sets. IDFCP can also examine the risk of violating system constraints. IDFCP is then applied to water resources allocation in the middle and upper reaches of Fen River Basin that is associated with multiuser, multiregion, and multisource features. Interval solutions of the compromise decision alternatives are generated under different scenarios in association with different risk levels of violating constraints (i.e., p levels), fuzzy membership degrees (i.e., -cut levels), credible degrees (i.e., minimum and maximum), and reclaimed water utilization ratios. Results obtained show that water availability can affect water allocation pattern and system benefit. Results are helpful for decision makers to identify desirable strategies under various environmental and system-credibility constraints in more profitable and sustainable ways.
引用
收藏
页码:525 / 544
页数:20
相关论文
共 50 条
[11]   Estimating most productive scale size with imprecise-chance constrained input-output orientation model in data envelopment analysis [J].
Eslami, R. ;
Khodabakhshi, M. ;
Jahanshahloo, G. R. ;
Lotfi, F. Hosseinzadeh ;
Khoveyni, M. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) :254-261
[12]   Administration of water resources in Beijing: problems and countermeasures [J].
Fan, Linlin ;
Wang, Hongrui ;
Lai, Wenli ;
Wang, Cheng .
WATER POLICY, 2015, 17 (04) :563-580
[13]  
Fiedler M., 2006, Linear optimization problems with inexact data
[14]   Fuzzy chance-constrained linear fractional programming approach for optimal water allocation [J].
Guo, Ping ;
Chen, Xiaohong ;
Li, Mo ;
Li, Jianbing .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2014, 28 (06) :1601-1612
[15]   Interval-Parameter Linear Optimization Model with Stochastic Vertices for Land and Water Resources Allocation Under Dual Uncertainty [J].
Han, Yan ;
Huang, Yuefei ;
Wang, Guangqian .
ENVIRONMENTAL ENGINEERING SCIENCE, 2011, 28 (03) :197-205
[16]  
Hassanzadeh E., 2016, J WATER RESOUR PLAN, V142, P1
[17]   Limited multi-stage stochastic programming for managing water supply systems [J].
Housh, Mashor ;
Ostfeld, Avi ;
Shamir, Uri .
ENVIRONMENTAL MODELLING & SOFTWARE, 2013, 41 :53-64
[18]   A GRAY LINEAR-PROGRAMMING APPROACH FOR MUNICIPAL SOLID-WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY [J].
HUANG, GH ;
BAETZ, BW ;
PATRY, GG .
CIVIL ENGINEERING SYSTEMS, 1992, 9 (04) :319-335
[19]   Integrated Modeling System for Water Resources Management of Tarim River Basin [J].
Huang, Yue ;
Chen, Xi ;
Li, Yongping ;
Willems, Patrick ;
Liu, Tie .
ENVIRONMENTAL ENGINEERING SCIENCE, 2010, 27 (03) :255-269
[20]   Cut sharing for multistage stochastic linear programs with interstage dependency [J].
Infanger, G ;
Morton, DP .
MATHEMATICAL PROGRAMMING, 1996, 75 (02) :241-256