When is the total-cost method appropriate?

被引:0
作者
Loulakis, MC
Santiago, SJ
机构
来源
CIVIL ENGINEERING | 2001年 / 71卷 / 08期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:104 / 104
页数:1
相关论文
共 50 条
[31]   ALLOCATING THE MATERIALS FUNDS USING TOTAL-COST OF MATERIALS [J].
CUBBERLEY, C .
JOURNAL OF ACADEMIC LIBRARIANSHIP, 1993, 19 (01) :16-21
[32]   EVALUATION OF THE TOTAL-COST OF UNDERGROUND TRANSPORTATION IN MINE DEVELOPMENT [J].
STREKACHINSKII, GA ;
KORTELEV, OB ;
CHEKHANKOV, YS .
SOVIET MINING SCIENCE USSR, 1987, 23 (05) :436-442
[33]   PARTNERSHIP AND TOTAL-COST MANAGEMENT - INTEGRAL TO ENHANCED PROFITABILITY [J].
ERICKSON, KC .
AUSTRALIAN JOURNAL OF PUBLIC ADMINISTRATION, 1994, 53 (01) :24-28
[34]   THE UNIT LEARNING-CURVE APPROXIMATION OF TOTAL-COST [J].
CAMM, JD ;
EVANS, JR ;
WOMER, NK .
COMPUTERS & INDUSTRIAL ENGINEERING, 1987, 12 (03) :205-213
[35]   USING THE TOTAL-COST OF SYSTEMS OWNERSHIP CONCEPT IN DP MANAGEMENT [J].
RACE, JPA .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1983, 34 (12) :A1-A1
[36]   ASSESSING THE TOTAL-COST OF OWNERSHIP FOR THE 90S AND BEYOND [J].
DREHER, R .
LC GC-MAGAZINE OF SEPARATION SCIENCE, 1992, 10 (08) :556-557
[37]   SOOTBLOWING OPTIMIZATION LOWERS TOTAL-COST OF RECOVERY BOILER OPERATION [J].
SLEJKO, DF ;
BELLER, JA .
ISA TRANSACTIONS, 1985, 24 (04) :41-44
[38]   TIME USE IN CHILD-CARE AND HOUSEWORK AND THE TOTAL-COST OF CHILDREN [J].
GUSTAFSSON, B ;
KJULIN, U .
JOURNAL OF POPULATION ECONOMICS, 1994, 7 (03) :287-306
[39]   THE ECONOMICS OF BIOMEDICAL WASTE IRRADIATION - KEY ISSUES INFLUENCING TOTAL-COST [J].
WILSON, BK .
RADIATION PHYSICS AND CHEMISTRY, 1993, 42 (1-3) :447-451
[40]   Optimality Conditions for Total-Cost Partially Observable Markov Decision Processes [J].
Feinberg, Eugene A. ;
Kasyanov, Pavlo O. ;
Zgurovsky, Michael Z. .
2013 IEEE 52ND ANNUAL CONFERENCE ON DECISION AND CONTROL (CDC), 2013, :5716-5721