共 50 条
- [27] SENSITIVITY STUDY OF OPTIMUM SEISMIC INTENSITY BASED ON MINIMIZATION METHOD OF EXPECTED TOTAL-COST PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON CIVIL AND STRUCTURAL ENGINEERING COMPUTING, VOLS 1 & 2, 1989, : 73 - 80
- [30] EVALUATION OF THE TOTAL-COST OF UNDERGROUND TRANSPORTATION IN MINE DEVELOPMENT SOVIET MINING SCIENCE USSR, 1987, 23 (05): : 436 - 442