Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine

被引:12
|
作者
Lee, Ju-Yong [1 ]
Kim, Yeong-Dae [2 ]
机构
[1] Samsung Elect Co Ltd, Syst Technol Team, Semicond Business, Yongin 17113, Gyeonggi Do, South Korea
[2] Korea Adv Inst Sci & Technol, Dept Ind Engn, Daejeon 34141, South Korea
关键词
Scheduling; Flowshop; Machine availability constraint; Branch and bound algorithm; Total tardiness; NO-WAIT FLOWSHOP; TOTAL COMPLETION-TIME; SINGLE-MACHINE; MAINTENANCE ACTIVITY; PREVENTIVE MAINTENANCE; PERIODIC MAINTENANCE; MAKESPAN; ALGORITHM; SHOP; HEURISTICS;
D O I
10.1016/j.cie.2017.10.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper deals with a two-machine flowshop problem in which the machine at the first stage requires preventive maintenance activities that have to be started within a given cumulative working time limit after the previous maintenance. That is, a maintenance activity can be started at any time unless the cumulative working time after the end of the previous maintenance exceeds the given limit. For the problem with the objective of minimizing total tardiness, we develop dominance properties and lower bounds for this scheduling problem as well as a heuristic algorithm, and suggest a branch and bound algorithm in which these properties, lower bounds, and heuristic algorithm are used. Computational experiments are performed to evaluate the algorithm and the results are reported.
引用
收藏
页码:22 / 30
页数:9
相关论文
共 50 条
  • [41] Two-machine Flowshop Problem with Release dates, Rejection and Non-availability Interval on the First Machine
    Xie, Xie
    Kong, Xiangyu
    Zheng, Yongyue
    Wei, Kun
    INDUSTRIAL ENGINEERING AND APPLIED RESEARCH, 2014, 620 : 80 - +
  • [42] A two-machine flowshop makespan scheduling problem with deteriorating jobs
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Wen, Chien-Chih
    Chung, Yu-Hsiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 737 - 749
  • [43] Two-machine flowshop scheduling problem with coupled-operations
    Meziani, Nadjat
    Oulamara, Ammar
    Boudhar, Mourad
    ANNALS OF OPERATIONS RESEARCH, 2019, 275 (02) : 511 - 530
  • [44] Minimizing the Total Completion Time in a Two-machine Flowshop with Release Times
    Gong, Hua
    Chen, Daheng
    PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 4136 - 4140
  • [45] PSO and simulated annealing for the two-machine flowshop scheduling problem with coupled-operations
    Meziani, Nadjat
    Boudhar, Mourad
    Oulamara, Ammar
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2018, 12 (01) : 43 - 66
  • [46] Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times
    Allahverdi, Ali
    Aydilek, Harun
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (21) : 6367 - 6385
  • [47] Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times
    Ladhari, T.
    Msakni, M. K.
    Allahverdi, A.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (04) : 445 - 459
  • [48] Minimizing total completion time in a two-machine flowshop with a learning effect
    Lee, WC
    Wu, CC
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 88 (01) : 85 - 93
  • [49] An hybrid metaheuristic, an hybrid lower bound and a Tabu search for the two-machine flowshop total tardiness problem
    Ta, Quang Chieu
    Billaut, Jean-Charles
    Bouquard, Jean-Louis
    PROCEEDINGS OF 2013 IEEE RIVF INTERNATIONAL CONFERENCE ON COMPUTING AND COMMUNICATION TECHNOLOGIES: RESEARCH, INNOVATION, AND VISION FOR THE FUTURE (RIVF), 2013, : 198 - 202
  • [50] Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times
    Aydilek, Harun
    Aydilek, Asiye
    Allahverdi, Ali
    ENGINEERING OPTIMIZATION, 2021, 53 (08) : 1417 - 1430