Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine

被引:12
|
作者
Lee, Ju-Yong [1 ]
Kim, Yeong-Dae [2 ]
机构
[1] Samsung Elect Co Ltd, Syst Technol Team, Semicond Business, Yongin 17113, Gyeonggi Do, South Korea
[2] Korea Adv Inst Sci & Technol, Dept Ind Engn, Daejeon 34141, South Korea
关键词
Scheduling; Flowshop; Machine availability constraint; Branch and bound algorithm; Total tardiness; NO-WAIT FLOWSHOP; TOTAL COMPLETION-TIME; SINGLE-MACHINE; MAINTENANCE ACTIVITY; PREVENTIVE MAINTENANCE; PERIODIC MAINTENANCE; MAKESPAN; ALGORITHM; SHOP; HEURISTICS;
D O I
10.1016/j.cie.2017.10.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper deals with a two-machine flowshop problem in which the machine at the first stage requires preventive maintenance activities that have to be started within a given cumulative working time limit after the previous maintenance. That is, a maintenance activity can be started at any time unless the cumulative working time after the end of the previous maintenance exceeds the given limit. For the problem with the objective of minimizing total tardiness, we develop dominance properties and lower bounds for this scheduling problem as well as a heuristic algorithm, and suggest a branch and bound algorithm in which these properties, lower bounds, and heuristic algorithm are used. Computational experiments are performed to evaluate the algorithm and the results are reported.
引用
收藏
页码:22 / 30
页数:9
相关论文
共 50 条
  • [31] A Two-Machine Flowshop Scheduling Problem with a Job Precedence Constraint to Minimize the Total Completion Time
    Xu, Jianyou
    Lin, Win-Chin
    Yin, Yunqiang
    Cheng, Yu
    Wu, Chin-Chia
    JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2017, 76 (12): : 761 - 766
  • [32] Heuristic algorithms for the two-machine flowshop with limited machine availability
    Blazewicz, J
    Breit, J
    Formanowicz, P
    Kubiak, W
    Schmidt, G
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2001, 29 (06): : 599 - 608
  • [33] Two-machine flowshop scheduling with bicriteria problem
    Chou, FD
    Lee, CE
    COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (03) : 549 - 564
  • [34] Two-machine flowshop scheduling in a physical examination center
    Wang, Yadong
    Fan, Baoqiang
    Zhai, Jingang
    Xiong, Wei
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2019, 37 (01) : 363 - 374
  • [35] Mixed Integer Programming Formulations for Two-Machine Flow Shop Scheduling with an Availability Constraint
    Xu, Zhijun
    Xu, Dehua
    He, Jie
    Wang, Qi
    Liu, Aihua
    Xiao, Junfang
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2018, 43 (02) : 777 - 788
  • [36] A two-agent scheduling problem in a two-machine flowshop
    Ahmadi-Darani, Mohammad-Hasan
    Moslehi, Ghasem
    Reisi-Nafchi, Mohammad
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2018, 9 (03) : 289 - 306
  • [37] A note on batch scheduling on a two-machine flowshop with machine-dependent processing times
    Mosheiov, Gur
    Oron, Daniel
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2023, 21 (03): : 457 - 469
  • [38] MINIMIZING TOTAL COMPLETION TIME IN A TWO-MACHINE NO-WAIT FLOWSHOP WITH UNCERTAIN AND BOUNDED SETUP TIMES
    Allahverdi, Muberra
    Allahverdi, Ali
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2020, 16 (05) : 2439 - 2457
  • [39] Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times
    An, Young-Jin
    Kim, Yeong-Dae
    Choi, Seong-Woo
    COMPUTERS & OPERATIONS RESEARCH, 2016, 71 : 127 - 136
  • [40] Minimizing total completion time in a two-machine flowshop: Analysis of special cases
    Hoogeveen, JA
    Kawaguchi, T
    MATHEMATICS OF OPERATIONS RESEARCH, 1999, 24 (04) : 887 - 910