Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine

被引:12
|
作者
Lee, Ju-Yong [1 ]
Kim, Yeong-Dae [2 ]
机构
[1] Samsung Elect Co Ltd, Syst Technol Team, Semicond Business, Yongin 17113, Gyeonggi Do, South Korea
[2] Korea Adv Inst Sci & Technol, Dept Ind Engn, Daejeon 34141, South Korea
关键词
Scheduling; Flowshop; Machine availability constraint; Branch and bound algorithm; Total tardiness; NO-WAIT FLOWSHOP; TOTAL COMPLETION-TIME; SINGLE-MACHINE; MAINTENANCE ACTIVITY; PREVENTIVE MAINTENANCE; PERIODIC MAINTENANCE; MAKESPAN; ALGORITHM; SHOP; HEURISTICS;
D O I
10.1016/j.cie.2017.10.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper deals with a two-machine flowshop problem in which the machine at the first stage requires preventive maintenance activities that have to be started within a given cumulative working time limit after the previous maintenance. That is, a maintenance activity can be started at any time unless the cumulative working time after the end of the previous maintenance exceeds the given limit. For the problem with the objective of minimizing total tardiness, we develop dominance properties and lower bounds for this scheduling problem as well as a heuristic algorithm, and suggest a branch and bound algorithm in which these properties, lower bounds, and heuristic algorithm are used. Computational experiments are performed to evaluate the algorithm and the results are reported.
引用
收藏
页码:22 / 30
页数:9
相关论文
共 50 条
  • [21] Stochastic two-machine flowshop scheduling problem with total completion time criterion
    Soroush, HM
    Allahverdi, A
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2005, 12 (02): : 159 - 171
  • [22] The two stage assembly flowshop scheduling problem to minimize total tardiness
    Allahverdi, Ali
    Aydilek, Harun
    JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (02) : 225 - 237
  • [23] A two-machine flowshop problem with two agents
    Lee, Wen-Chiung
    Chen, Shiuan-Kang
    Chen, Cheng-Wei
    Wu, Chin-Chia
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 98 - 104
  • [24] Bicriteria scheduling in a two-machine permutation flowshop
    Lin, BMT
    Wu, JM
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (12) : 2299 - 2312
  • [25] Two-machine flowshop batching and scheduling
    Lin, BMT
    Cheng, TCE
    ANNALS OF OPERATIONS RESEARCH, 2005, 133 (1-4) : 149 - 161
  • [26] Minimizing the total completion time in a two-machine flowshop problem with time delays
    Msakni, Mohamed Kais
    Khallouli, Wael
    Al-Salem, Mohamed
    Ladhari, Talel
    ENGINEERING OPTIMIZATION, 2016, 48 (07) : 1164 - 1181
  • [27] Two-machine No-wait Flowshop Scheduling with Availability Constraints and Release Dates
    Ben Chihaoui, Faten
    Dridi, Najoua
    Hadj-Alouane, Atidel B.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 170 - 175
  • [28] Two-machine flowshop scheduling with fuzzy processing times and flexible operations
    Uruk, Zeynep
    Yalciner, Ayten Yilmaz
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2024, 18 (01) : 100 - 119
  • [29] Two-Machine Flowshop Batching and Scheduling
    B. M. T. Lin
    T. C. E. Cheng
    Annals of Operations Research, 2005, 133 : 149 - 161
  • [30] Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times
    Jeong, BongJoo
    Kim, Yeong-Dae
    COMPUTERS & OPERATIONS RESEARCH, 2014, 47 : 72 - 80