Part load operation coefficient of air-conditioning system of public building

被引:13
作者
Ding, Yong [1 ,2 ]
Li, Baizhan [1 ,2 ]
Yao, Runming [3 ]
Tan, Ying [1 ,2 ]
机构
[1] Chongqing Univ, Fac Urban Construct & Environm Engn, Chongqing 400045, Peoples R China
[2] Chongqing Univ, China Key Lab Gorges Reservoir Reg Ecoenvironm 3, Minist Educ, Chongqing 400045, Peoples R China
[3] Univ Reading, Sch Construct Management & Engn, Reading RG66AW, Berks, England
基金
中国国家自然科学基金;
关键词
Public buildings; Energy consumption during operation; Air-conditioning system; Part load operation coefficient;
D O I
10.1016/j.enbuild.2010.05.026
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
IPLV overall coefficient, presented by Air-Conditioning and Refrigeration Institute (ARI) of America, shows running/operation status of air-conditioning system host only. For overall operation coefficient, logical solution has not been developed, to reflect the whole air-conditioning system under part load. In this research undertaking, the running time proportions of air-conditioning systems under part load have been obtained through analysis on energy consumption data during practical operation in all public buildings in Chongqing. This was achieved by using analysis methods, based on the statistical energy consumption data distribution of public buildings month-by-month. Comparing with the weight number of IPLV, part load operation coefficient of air-conditioning system, based on this research, does not only show the status of system refrigerating host, but also reflects and calculate energy efficiency of the whole air-conditioning system. The coefficient results from the processing and analyzing of practical running data, shows the practical running status of area and building type (actual and objective) - not clear. The method is different from model analysis which gets IPLV weight number, in the sense that this method of coefficient results in both four equal proportions and also part load operation coefficient of air-conditioning system under any load rate as necessary. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:1902 / 1907
页数:6
相关论文
共 20 条
[1]  
[Anonymous], 2005, 501892005 GB
[2]  
*ARI, 55059022003 ARI
[3]  
*ARI, 55059021998 ARI
[4]  
*CHONGQ U, 2009, WORK SUMM OUTC COLL
[5]  
*CHONGQ U, 2008, STEPW BRIEF SUMM EN
[6]  
*CHONGQ U, 2008, WORK SUMM OUTC COLL
[7]   EnergyPlus: creating a new-generation building energy simulation program [J].
Crawley, DB ;
Lawrie, LK ;
Winkelmann, FC ;
Buhl, WF ;
Huang, YJ ;
Pedersen, CO ;
Strand, RK ;
Liesen, RJ ;
Fisher, DE ;
Witte, MJ ;
Glazer, J .
ENERGY AND BUILDINGS, 2001, 33 (04) :319-331
[8]  
Deng Shiming, 2000, ENERGY BUILDINGS, P31
[9]  
GEISTER RW, 2009, ASHRAE J, P22
[10]  
HAERL J, 1996, ENERG BUILDINGS, V24, P27