Design and operation of a stochastic hydrogen supply chain network under demand uncertainty

被引:126
作者
Almansoori, A. [1 ]
Shah, N. [2 ]
机构
[1] Petr Inst, Dept Chem Engn, Abu Dhabi, U Arab Emirates
[2] Univ London Imperial Coll Sci Technol & Med, Dept Chem Engn, Ctr Proc Syst Engn, London SW7 2AZ, England
关键词
Hydrogen supply chain; MILP stochastic model; Demand uncertainty; Risk analysis; Scenarios-based approach; Great Britain; INFRASTRUCTURE; OPTIMIZATION;
D O I
10.1016/j.ijhydene.2011.11.091
中图分类号
O64 [物理化学(理论化学)、化学物理学];
学科分类号
070304 ; 081704 ;
摘要
The design of a future hydrogen supply chain (HSC) network is challenging due to the: (1) involvement of many echelons in the supply chain network, (2) high level of interactions between the supply chain components and sub-systems, and (3) uncertainty in hydrogen demand. Most of the early attempts to design the future HSC failed to incorporate all these challenges in a single generic optimization framework using mathematical modeling approach. Building on our previous multiperiod MILP model, the model presented in this paper is expanded to take into account uncertainty arising from long-term variation in hydrogen demand using a scenario-based approach. The model also adds another echelon: fueling stations and local distribution of hydrogen. Our results show that the future HSC network is somewhat similar to the existing petroleum infrastructure in terms of production, distribution, and storage. In both situations, the most feasible solution is centralized production plants with truck and rail delivery and small-to-large storage facilities. The main difference is that the future hydrogen supply has the benefits of using distributed forecourt production of hydrogen at local fueling stations via several production technologies. Finally, the performance of the studied models was evaluated using sensitivity and risk analyses. Copyright (C) 2011, Hydrogen Energy Publications, LLC. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:3965 / 3977
页数:13
相关论文
共 31 条
  • [1] Hydrogen infrastructure for the transport sector
    Agnolucci, Paolo
    [J]. INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2007, 32 (15) : 3526 - 3544
  • [2] Design and operation of a future hydrogen supply chain - Snapshot model
    Almansoori, A.
    Shah, N.
    [J]. CHEMICAL ENGINEERING RESEARCH & DESIGN, 2006, 84 (A6) : 423 - 438
  • [3] Design and operation of a future hydrogen supply chain: Multi-period model
    Almansoori, A.
    Shah, N.
    [J]. INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2009, 34 (19) : 7883 - 7897
  • [4] Almansoori A., 2006, THESIS IMPERIAL COLL
  • [5] Amos WA, 1998, Costs of storing and transporting hydrogen, P1
  • [6] [Anonymous], HYDROGEN SUPPLY COST
  • [7] [Anonymous], HYDR EC OPP COSTS BA
  • [8] An integrated decision support framework for the assessment and analysis of hydrogen production pathways
    Chui, F
    Elkamel, A
    Fowler, M
    [J]. ENERGY & FUELS, 2006, 20 (01) : 346 - 352
  • [9] Multiobjective supply chain design under uncertainty
    Guillén, G
    Mele, E
    Bagajewicz, MJ
    Espuña, A
    Puigjaner, L
    [J]. CHEMICAL ENGINEERING SCIENCE, 2005, 60 (06) : 1535 - 1553
  • [10] A Bi-Criterion Optimization Approach for the Design and Planning of Hydrogen Supply Chains for Vehicle Use
    Guillen-Gosalbez, Gonzalo
    Mele, Fernando D.
    Grossmann, Ignacio E.
    [J]. AICHE JOURNAL, 2010, 56 (03) : 650 - 667