Reliability of construction of nuclear power facilities in the global energy market

被引:1
作者
Grabovy, Pyotr Grigoryevich [1 ]
Baronin, Sergey Aleksandrovich [2 ,3 ]
Berezka, Vitaly Viktorovich [1 ]
机构
[1] Natl Res Moscow State Univ Civil Engn NIU MGSU, Moscow, Russia
[2] Penza State Univ Architecture & Construct, Penza, Russia
[3] Int Mortgage & Real Estate Acad MAIN, Moscow, Russia
来源
NEXO REVISTA CIENTIFICA | 2021年 / 34卷 / 06期
关键词
feasibility study; international construction; non-failure operation; NPP construction; COST;
D O I
10.5377/nexo.v34i06.13184
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose: development of conceptual provisions, methodical approaches and practical recommendations about modeling and integrated management at a pre-investment stage of nuclear power construction facilities in the international energy construction market. Materials and methods: a set of the interrelated methodological approaches based on the theory of complex systems life cycle, methods of abstraction, comparison, analysis, synthesis, opposition, modeling, forecasting, expert assessments, risk theory and others. The research is conducted with the use of open data resources of the International Energy Agency (IEA), International Atomic Energy Agency (IAEA), World Nuclear Association (WNA), Nuclear Energy Agency under OECD and ROSATOM State Corporation open statistical data. Results: Features of the modern global world market of nuclear power construction, as well as the role and place of Russia in it, are considered. A comprehensive review of the literature on the studied problems is accomplished. A methodology for modeling the organizational and economic reliability (OER) of complex systems is suggested. Modeling of the structural components of the life cycle (hereinafter LCi-j) of an investment project for the NPP construction on the international market in the conditions of high competition is proposed.
引用
收藏
页码:1850 / 1866
页数:17
相关论文
共 31 条
  • [1] [Anonymous], 2009, Energy strategy of Russia for the period up to 2030. Decree of the Government of the Russian Federation
  • [2] Baronin S., 2014, LIFE SCI J, V11, P249
  • [3] Berezka V.V, 2019, REAL ESTATE EC MANAG, V1, P13
  • [4] Chernyakhovskaya Y, 2020, AEBMR ADV ECON, V128, P2203
  • [5] Chernyakhovskaya Yu.V., 2019, REAL ESTATE EC MANAG, V2, P53
  • [6] Escobar L, 2014, THESIS ECOLE NATL SU
  • [7] Cost overruns and financial risk in the construction of nuclear power reactors: A critical appraisal
    Gilbert, Alexander
    Sovacool, Benjamin K.
    Johnstone, Phil
    Stirling, Andy
    [J]. ENERGY POLICY, 2017, 102 : 644 - 649
  • [8] Graboviy P.G., 2021, REAL ESTATE EC MANAG, V1, P59, DOI [10.22337/2073-8412-2021-1-59-69, DOI 10.22337/2073-8412-2021-1-59-69]
  • [9] Grabovy Peter, 2020, IOP Conference Series: Materials Science and Engineering, V869, DOI 10.1088/1757-899X/869/6/062038
  • [10] Grabovy P.G., 2019, REAL ESTATE EC MANAG, V3, P6