Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times

被引:38
|
作者
Damodaran, Purushothaman [1 ]
Velez-Gallego, Mario C. [2 ]
机构
[1] No Illinois Univ, Dept Ind & Syst Engn, De Kalb, IL 60115 USA
[2] Univ EAFIT, Dept Ingn Prod, Medellin, Colombia
来源
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY | 2010年 / 49卷 / 9-12期
关键词
Identical parallel machines; Batch processing machines; Unequal ready times; Makespan; Heuristics; TOTAL WEIGHTED TARDINESS; MINIMIZING MAKESPAN; COMPLETION-TIME; FAMILIES; SIZES; ALGORITHMS;
D O I
10.1007/s00170-009-2457-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This research aims at minimizing the makespan of a set of identical batch processing machines arranged in parallel. Each job is defined by its processing time, ready time, and size. Each machine can process several jobs simultaneously as long as the machine capacity is not exceeded. The batch processing and ready times depend upon the batch composition. The batch processing time is equal to the longest processing job in the batch, and the batch ready time is equal to the largest ready time among those jobs in the batch. The problem under study is NP-hard. Consequently, a constructive heuristic is proposed and its performance with respect to solution quality and computational cost is compared against other solution approaches found in the literature. The computational experiments on a set of randomly generated instances show that the performance of the proposed heuristic is competitive with respect to solution quality and requires little computational cost.
引用
收藏
页码:1119 / 1128
页数:10
相关论文
共 50 条
  • [1] Heuristics for makespan minimization on parallel batch processing machines with unequal job ready times
    Purushothaman Damodaran
    Mario C. Velez-Gallego
    The International Journal of Advanced Manufacturing Technology, 2010, 49 : 1119 - 1128
  • [2] A simulated annealing algorithm to minimize makespan of parallel batch processing machines with unequal job ready times
    Damodaran, Purushothaman
    Velez-Gallego, Mario C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (01) : 1451 - 1458
  • [3] Efficient algorithms to minimize makespan of the unrelated parallel batch-processing machines scheduling problem with unequal job ready times
    Zarook, Yaser
    Rezaeian, Javad
    Mahdavi, Iraj
    Yaghini, Masoud
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (03) : 1501 - 1522
  • [4] EFFECTIVE HEURISTICS FOR MAKESPAN MINIMIZATION IN PARALLEL BATCH MACHINES WITH NON-IDENTICAL CAPACITIES AND JOB RELEASE TIMES
    Jia, Zhao-Hong
    Wen, Ting-Ting
    Leung, Joseph Y. -T.
    Li, Kai
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2017, 13 (02) : 977 - 993
  • [5] A hybrid cuckoo search algorithm in parallel batch processing machines with unequal job ready times
    Majumder, Arindam
    Laha, Dipak
    Suganthan, P. N.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 124 : 65 - 76
  • [6] Heuristics to minimize makespan of parallel batch processing machines
    Purushothaman Damodaran
    Ping-Yu Chang
    The International Journal of Advanced Manufacturing Technology, 2008, 37 : 1005 - 1013
  • [7] Heuristics to minimize makespan of parallel batch processing machines
    Damodaran, Purushothaman
    Chang, Ping-Yu
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 37 (9-10): : 1005 - 1013
  • [8] Heuristics to minimize makespan of parallel batch processing machines
    Damodaran, Purushothaman
    Chang, Ping-Yu
    International Journal of Advanced Manufacturing Technology, 2008, 37 (9-10): : 1005 - 1013
  • [9] Minimising makespan of batch processing machine with unequal ready times
    Ghrayeb L.
    Muthuswamy S.
    Damodaran P.
    International Journal of Industrial and Systems Engineering, 2022, 40 (04): : 496 - 512
  • [10] Minimising makespan of a batch processing machine with unequal job ready times using simulated annealing
    Ghrayeb L.
    Damodaran P.
    International Journal of Industrial and Systems Engineering, 2023, 43 (02) : 222 - 237