Uncertainty quantification and value of information assessment using proxies and Markov chain Monte Carlo method for a pilot project

被引:33
作者
Chen, Bailian [1 ]
He, Jincong [2 ]
Wen, Xian-Huan [2 ]
Chen, Wen [2 ]
Reynolds, Albert C. [1 ]
机构
[1] Univ Tulsa, 800 South Tucker Dr, Tulsa, OK 74104 USA
[2] Chevron Energy Technol Co, Houston, TX USA
关键词
Uncertainty quantification; Value of information; Pilot design analysis; Proxy models; MCMC;
D O I
10.1016/j.petrol.2017.07.039
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A pilot project is a crucial step of reservoir management that enables the minimization of subsurface risks and improves the quality of decisions on full-field development. Selecting a pilot project involves evaluating the expected uncertainty reduction and the value of information (VOI) attainable from a set of plausible pilot projects. Proxy-based pilot analysis (PBPA) represents a promising approach for characterizing the uncertainty reduction and VOI from each of a set of feasible pilot projects. In the PBPA method, multiple plausible realizations of observed data from a pilot are generated and probabilistic history matching (based on filtering) is performed for each realization of the vector of observed data in order to obtain the corresponding posterior distribution. The multiple history-matching runs are accomplished with a manageable number of simulations with the help of proxies. Previously, PBPA was successfully applied to quantify the expected value of uncertainty reduction in cases where the history-matching tolerance is high, but as shown here, the filtering-based history-matching procedure can fail when the tolerance is low. Moreover, it has not been demonstrated previously that the PBPA method can quantify VOI. In this paper, enhancements to PBPA that eliminate these two PBPA shortcomings are introduced. First, a Markov chain Monte Carlo (MCMC) method is used in place of the filtering procedure to calculate the posterior distribution. The combined MCMC-PBPA procedure is shown to outperform the filtering-based PBPA when the history-matching tolerance is low. Secondly, we define a framework that combines the MCMC-PBPA method with decision tree analysis in order to calculate the VOI. The proposed framework is demonstrated for a synthetic waterflooding pilot in the Brugge reservoir where it successfully quantifies the VOI for different pilot designs.
引用
收藏
页码:328 / 339
页数:12
相关论文
共 44 条
[1]   Optimizing Subsurface Field Data Acquisition Using Information Theory [J].
Abellan, A. ;
Noetinger, B. .
MATHEMATICAL GEOSCIENCES, 2010, 42 (06) :603-630
[2]  
[Anonymous], INVERSE THEORY PETRO
[3]  
[Anonymous], 2013, THESIS
[4]   Value of information in closed-loop reservoir management [J].
Barros, E. G. D. ;
Van den Hof, P. M. J. ;
Jansen, J. D. .
COMPUTATIONAL GEOSCIENCES, 2016, 20 (03) :737-749
[5]  
Bazargan H., 2013, SPE RES SIM S
[6]   A Hybrid Markov Chain Monte Carlo Method for Generating Permeability Fields Conditioned to Multiwell Pressure Data and Prior Information [J].
Bonet-Cunha, Luciano ;
Oliver, D. S. ;
Redner, R. A. ;
Reynolds, A. C. .
SPE JOURNAL, 1998, 3 (03) :261-271
[7]   Value of Information in the Oil and Gas Industry: Past, Present, and Future [J].
Bratvold, Reidar B. ;
Bickel, J. Eric ;
Lohne, Hans Petter .
SPE RESERVOIR EVALUATION & ENGINEERING, 2009, 12 (04) :630-638
[8]   General methods for monitoring convergence of iterative simulations [J].
Brooks, SP ;
Gelman, A .
JOURNAL OF COMPUTATIONAL AND GRAPHICAL STATISTICS, 1998, 7 (04) :434-455
[9]  
Caers J, 2011, MODELING UNCERTAINTY IN THE EARTH SCIENCES, P1, DOI 10.1002/9781119995920
[10]  
Carreno L., 2013, P SPE ART LIFT C AM, P21