Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project

被引:26
|
作者
Kim, Changyoon [1 ]
Kim, Hyoungkwan [1 ]
Park, Taekwun [2 ]
Kim, Moon Kyum [3 ]
机构
[1] Yonsei Univ, Sch Civil & Environm Engn, Seoul 120749, South Korea
[2] Daelim Ind Corp, Seoul 110732, South Korea
[3] Yonsei Univ, Dept Civil & Environm Engn, Seoul 120749, South Korea
关键词
4D CAD; Cable-stayed bridge; Civil engineering construction; VISUALIZATION; 3D; MANAGEMENT; SIMULATION;
D O I
10.1061/(ASCE)CP.1943-5487.0000074
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Four-dimensional (4D) computer-aided design (CAD) has been credited with improving construction planning procedures. The integration of three-dimensional CAD with schedule information has enabled the effective detection of design and planning flaws in many construction projects. However, the benefit of 4D CAD has been centered on architectural constructions, as other areas such as civil infrastructure have seldom been the target of 4D CAD application. This paper presents a case study in which a cable-stayed bridge construction was analyzed and modeled using the 4D graphic simulation approach. The cable-stayed bridge was chosen for the case study because it suitably represents the complex nature of modern civil infrastructure. 4D CAD models were developed at three different levels of detail: activity, discrete operation, and continuous operation. The clear definitions of the three levels of detail of 4D CAD and their application results for the cable-stayed bridge are presented herein.
引用
收藏
页码:98 / 107
页数:10
相关论文
共 30 条
  • [21] Failure Patterns and Ultimate Load-Carrying Capacity Evolution of a Prestressed Concrete Cable-Stayed Bridge: Case Study
    Yang, Ou
    Li, Hui
    Ou, Jinping
    Li, Q. S.
    ADVANCES IN STRUCTURAL ENGINEERING, 2013, 16 (07) : 1283 - 1296
  • [22] Case Study of Deep Learning Model of Temperature-Induced Deflection of a Cable-Stayed Bridge Driven by Data Knowledge
    Yue, Zixiang
    Ding, Youliang
    Zhao, Hanwei
    Wang, Zhiwen
    SYMMETRY-BASEL, 2021, 13 (12):
  • [23] A 4D automatic simulation tool for construction resource planning: a case study
    Li, Heng
    Chan, Greg
    Skitmore, Martin
    Huang, Ting
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (05) : 536 - 550
  • [24] Improvement of Link Process in 4D CAD Viewer by Using Interface Board for Construction Project Management
    Leen, Seok Kang
    Hyoun, Seong Kim
    Hyoun, Seok Moon
    Chang, Hak Kim
    2009 THIRD INTERNATIONAL CONFERENCE ON ADVANCED ENGINEERING COMPUTING AND APPLICATIONS IN SCIENCES (ADVCOMP 2009), 2009, : 83 - +
  • [25] Bridge Carbon Emissions and Driving Factors Based on a Life-Cycle Assessment Case Study: Cable-Stayed Bridge over Hun He River in Liaoning, China
    Zhou, ZhiWu
    Alcala, Julian
    Yepes, Victor
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2020, 17 (16) : 1 - 22
  • [26] 4D BIM Simulation Guideline for Construction Visualization and Analysis of Renovation Projects: A Case Study
    Alzarrad, M. Ammar
    Moynihan, Gary P.
    Parajuli, Aakash
    Mehra, Mayuri
    FRONTIERS IN BUILT ENVIRONMENT, 2021, 7
  • [27] Deep Learning-Based Minute-Scale Digital Prediction Model of Temperature-Induced Deflection of a Cable-Stayed Bridge: Case Study
    Yue, Zi-xiang
    Ding, You-liang
    Zhao, Han-wei
    JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (06)
  • [28] The challenge of level of development in 4D/BIM simulation across AEC project lifecycle. A case study
    Boton, Conrad
    Kubicki, Sylvain
    Halin, Gilles
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 59 - 67
  • [29] 4D visualization to bridge the knowing-doing gap in megaprojects: an Australian case study
    Datta, Abhijnan
    Ninan, Johan
    Sankaran, Shankar
    CONSTRUCTION ECONOMICS AND BUILDING, 2020, 20 (04): : 25 - 41
  • [30] 4D Modeling and BIM-Based Project Planning Using Constraint-Based Simulation for Implementation in Iran Considering an Actual Case Study
    Hadavi, Payam
    Tavakolan, Mehdi
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION INFORMATION TECHNOLOGY, 2018, : 542 - 551