Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project

被引:26
作者
Kim, Changyoon [1 ]
Kim, Hyoungkwan [1 ]
Park, Taekwun [2 ]
Kim, Moon Kyum [3 ]
机构
[1] Yonsei Univ, Sch Civil & Environm Engn, Seoul 120749, South Korea
[2] Daelim Ind Corp, Seoul 110732, South Korea
[3] Yonsei Univ, Dept Civil & Environm Engn, Seoul 120749, South Korea
关键词
4D CAD; Cable-stayed bridge; Civil engineering construction; VISUALIZATION; 3D; MANAGEMENT; SIMULATION;
D O I
10.1061/(ASCE)CP.1943-5487.0000074
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Four-dimensional (4D) computer-aided design (CAD) has been credited with improving construction planning procedures. The integration of three-dimensional CAD with schedule information has enabled the effective detection of design and planning flaws in many construction projects. However, the benefit of 4D CAD has been centered on architectural constructions, as other areas such as civil infrastructure have seldom been the target of 4D CAD application. This paper presents a case study in which a cable-stayed bridge construction was analyzed and modeled using the 4D graphic simulation approach. The cable-stayed bridge was chosen for the case study because it suitably represents the complex nature of modern civil infrastructure. 4D CAD models were developed at three different levels of detail: activity, discrete operation, and continuous operation. The clear definitions of the three levels of detail of 4D CAD and their application results for the cable-stayed bridge are presented herein.
引用
收藏
页码:98 / 107
页数:10
相关论文
共 23 条
[11]   Areas of application for 3D and 4D models on construction projects [J].
Hartmann, Timo ;
Gao, Ju ;
Fischer, Martin .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (10) :776-785
[12]   A method for planning of work-flow by combined use of location-based scheduling and 4D CAD [J].
Jongeling, Rogier ;
Olofsson, Thomas .
AUTOMATION IN CONSTRUCTION, 2007, 16 (02) :189-198
[13]   Generic representation of 3D motion paths in dynamic animations of simulated construction processes [J].
Kamat, Vineet R. ;
Martinez, Julio C. .
AUTOMATION IN CONSTRUCTION, 2008, 17 (02) :188-200
[14]   Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling [J].
Kang, Julian H. ;
Anderson, Stuart D. ;
Clayton, Mark J. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (06) :447-461
[15]  
KANG LS, 2007, KOREAN J CIVIL ENG, V27, P759
[16]   Planning and visualization for automated robotic crane erection processes in construction [J].
Kang, ShihChung ;
Miranda, Eduardo .
AUTOMATION IN CONSTRUCTION, 2006, 15 (04) :398-414
[17]   Feasibility study of 4D CAD in commercial construction [J].
Koo, B ;
Fischer, M .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (04) :251-260
[18]   Collision detection strategies for virtual construction simulation [J].
Lai, Kuan-Chen ;
Kang, Shih-Chung .
AUTOMATION IN CONSTRUCTION, 2009, 18 (06) :724-736
[19]   Application of 4D for dynamic site layout and management of construction projects [J].
Ma, ZY ;
Shen, QP ;
Zhang, JP .
AUTOMATION IN CONSTRUCTION, 2005, 14 (03) :369-381
[20]   Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction [J].
Park, Taekwun ;
Kim, Moon Kyum ;
Kim, Changyoon ;
Kim, Hyoungkwan .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (11) :1261-1270