Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project

被引:26
作者
Kim, Changyoon [1 ]
Kim, Hyoungkwan [1 ]
Park, Taekwun [2 ]
Kim, Moon Kyum [3 ]
机构
[1] Yonsei Univ, Sch Civil & Environm Engn, Seoul 120749, South Korea
[2] Daelim Ind Corp, Seoul 110732, South Korea
[3] Yonsei Univ, Dept Civil & Environm Engn, Seoul 120749, South Korea
关键词
4D CAD; Cable-stayed bridge; Civil engineering construction; VISUALIZATION; 3D; MANAGEMENT; SIMULATION;
D O I
10.1061/(ASCE)CP.1943-5487.0000074
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Four-dimensional (4D) computer-aided design (CAD) has been credited with improving construction planning procedures. The integration of three-dimensional CAD with schedule information has enabled the effective detection of design and planning flaws in many construction projects. However, the benefit of 4D CAD has been centered on architectural constructions, as other areas such as civil infrastructure have seldom been the target of 4D CAD application. This paper presents a case study in which a cable-stayed bridge construction was analyzed and modeled using the 4D graphic simulation approach. The cable-stayed bridge was chosen for the case study because it suitably represents the complex nature of modern civil infrastructure. 4D CAD models were developed at three different levels of detail: activity, discrete operation, and continuous operation. The clear definitions of the three levels of detail of 4D CAD and their application results for the cable-stayed bridge are presented herein.
引用
收藏
页码:98 / 107
页数:10
相关论文
共 23 条
[1]   Automated generation of work spaces required by construction activities [J].
Akinci, B ;
Fischer, M ;
Kunz, J .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (04) :306-315
[2]   Integrating 3D visualization and simulation for tower crane operations on construction sites [J].
Al-Hussein, Mohamed ;
Niaz, Muhammad Athar ;
Yu, Haitao ;
Kim, Hyoungkwan .
AUTOMATION IN CONSTRUCTION, 2006, 15 (05) :554-562
[3]   Generating, evaluating, and visualizing construction schedule with geographic information systems [J].
Bansal, V. K. ;
Pal, Mahesh .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2008, 22 (04) :233-242
[4]   Four-dimensional visualization of construction scheduling and site utilization [J].
Chau, KW ;
Anson, M ;
Zhang, JP .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (04) :598-606
[5]   RFID+4D CAD for progress management of structural steel works in high-rise buildings [J].
Chin, Sangyoon ;
Yoon, Suwon ;
Choi, Cheolho ;
Cho, Changyon .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2008, 22 (02) :74-89
[6]   Development of an integrated information resource base for 4D/VR construction processes simulation [J].
Dawood, N ;
Sriprasert, E ;
Mallasi, Z ;
Hobbs, B .
AUTOMATION IN CONSTRUCTION, 2003, 12 (02) :123-131
[7]   Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies [J].
Dawood, Nashwan ;
Mallasi, Zaki .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2006, 21 (07) :498-513
[8]  
Denavit J., 1955, J APPL MECH, V22, P215, DOI [10.1115/1.4011045, DOI 10.1115/1.4011045]
[9]   Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs [J].
Golparvar-Fard, Mani ;
Pena-Mora, Feniosky ;
Arboleda, Carlos A. ;
Lee, SangHyun .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2009, 23 (06) :391-404
[10]  
Halpin D., 1998, CONSTRUCTION MANAGEM, V2nd