Tactical capacity planning in an integrated multi-stakeholder freight transportation system

被引:12
作者
Taherkhani, Gita [1 ]
Bilegan, Ioana C. [2 ]
Crainic, Teodor Gabriel [3 ,4 ]
Gendreau, Michel [5 ,6 ]
Rei, Walter [3 ,4 ]
机构
[1] Loyola Univ, Quinlan Sch Business, 16 E Pearson Ave, Chicago, IL 60611 USA
[2] Univ Polytech Hauts France, CNRS, LAMIH, UMR 8201, F-59313 Valenciennes, France
[3] Univ Quebec Montreal, CIRRELT, BP 8888, Montreal, PQ H3C 3P8, Canada
[4] Univ Quebec Montreal, Sch Management Sci, BP 8888, Montreal, PQ H3C 3P8, Canada
[5] Ecole Polytech Montreal, CIRRELT, Montreal, PQ H3C 3A7, Canada
[6] Ecole Polytech Montreal, Dept Math & Genie Ind, Montreal, PQ H3C 3A7, Canada
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2022年 / 110卷
基金
加拿大自然科学与工程研究理事会; 欧盟地平线“2020”;
关键词
Tactical planning; Integrated consolidation-based freight  transportation; Revenue management; Scheduled service network design; SERVICE NETWORK DESIGN; REVENUE MANAGEMENT; 3RD-PARTY LOGISTICS; PERFORMANCE; MODELS;
D O I
10.1016/j.omega.2022.102628
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This study focuses on investigating the tactical planning of an integrated multi-stakeholder system in which revenue management concepts including shipper categories, demand classification, penalty costs for demand satisfaction outside of prescribed time-windows, and offering services with bundles are addressed. The aim of the tactical planning in this system is to design the demand and supply sides of this integrated system simultaneously. To this end, a scheduled service network design formulation on a space-time network is developed to build a transportation plan by selecting profitable requests from non-contract shippers, selecting a subset of individual and bundled transportation scheduled services, and identifying the itineraries of the shipments on the selected service network with the objective of maximizing the profit of the system. Using realistic-size instances, an extensive computational analysis is performed on the split and unsplit shipment-flow versions of the problem. The aim of the analysis is twofold: 1) assess the computational effort required to solve the developed optimization model and 2) investigate the structural characteristics of the obtained tactical plans for different system settings.(c) 2022 Published by Elsevier Ltd.
引用
收藏
页数:16
相关论文
共 32 条
  • [31] Multi-objective capacity programming and operation optimization of an integrated energy system considering hydrogen energy storage for collective energy communities
    Wang, Jinshi
    Xue, Kai
    Guo, Yanjun
    Ma, Jinpeng
    Zhou, Xuan
    Liu, Ming
    Yan, Junjie
    ENERGY CONVERSION AND MANAGEMENT, 2022, 268
  • [32] Precast components on-site construction planning and scheduling method based on a novel deep learning integrated multi-agent system
    Jiang, Shanshan
    Yang, Bin
    Liu, Boda
    JOURNAL OF BUILDING ENGINEERING, 2025, 102