A cross-docking scheduling problem with sub-population multi-objective algorithms

被引:27
作者
Arabani, A. Boloori [2 ]
Zandieh, M. [1 ]
Ghomi, S. M. T. Fatemi [3 ]
机构
[1] Shahid Beheshti Univ, Dept Ind Management, Management & Accounting Fac, GC, Tehran, Iran
[2] Wayne State Univ, Dept Ind & Syst Engn, Detroit, MI 48202 USA
[3] Amirkabir Univ Technol, Dept Ind Engn, Tehran, Iran
关键词
Cross-docking; Multi-objective scheduling; Makespan; Lateness; POPULATION GENETIC ALGORITHM;
D O I
10.1007/s00170-011-3402-7
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper deals with a scheduling problem of inbound and outbound trucks shipping incoming and outgoing product items into/out of a cross-docking system. We consider an instance of cross-docking systems in which more than one objective are taken into account: minimization of the total operation time (makespan) and minimization of the total lateness of outbound trucks. In order to deal with this problem, three multi-objective algorithms are developed as follows (based on the sub-population concept of evolutionary algorithms): sub-population genetic algorithm-II (SPGA-II), sub-population particle swarm optimization-II (SPPSO-II), and sub-population differential evolution algorithm-II (SPDE-II). In addition, to evaluate the performance of these algorithms, four measures are presented and compared with each other whose results will demonstrate that the SPPSO-II has better characteristics in comparison with other two algorithms.
引用
收藏
页码:741 / 761
页数:21
相关论文
共 50 条
[21]   A Lagrangian heuristics for the truck scheduling problem in multi-door, multi-product Cross-Docking with constant processing [J].
Gaudioso, Manlio ;
Monaco, Maria Flavia ;
Sammarra, Marcello .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2021, 101
[22]   A multiplier adjustment algorithm for a truck scheduling and transshipment problem at a cross-docking terminal [J].
M. Flavia Monaco ;
Marcello Sammarra .
Soft Computing, 2023, 27 :4169-4193
[23]   A multiplier adjustment algorithm for a truck scheduling and transshipment problem at a cross-docking terminal [J].
Monaco, M. Flavia ;
Sammarra, Marcello .
SOFT COMPUTING, 2023, 27 (07) :4169-4193
[24]   Time-indexed formulation and polynomial time heuristic for a multi-dock truck scheduling problem in a cross-docking centre [J].
Cota, Priscila M. ;
Gimenez, Barbara M. R. ;
Araujo, Dhiego P. M. ;
Nogueira, Thiago H. ;
de Souza, Mauricio C. ;
Ravetti, Martin G. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 95 :135-143
[25]   An Evolutionary Solution to a Multi-objective Scheduling Problem [J].
Samur, Sumeyye ;
Bulkan, Serol .
WORLD CONGRESS ON ENGINEERING, WCE 2010, VOL III, 2010, :1717-1721
[26]   New Approaches in Metaheuristics to Solve the Truck Scheduling Problem in a Cross-docking Center [J].
Mohammadzadeh, H. ;
Sahebjamnia, N. ;
Fathollahi-Fard, A. M. ;
Hahiaghaei-Keshteli, M. .
INTERNATIONAL JOURNAL OF ENGINEERING, 2018, 31 (08) :1258-1266
[27]   The Vehicle Routing Problem with Cross-Docking and Scheduling at the Docking Station: Compact formulation and a General Variable Neighborhood Search metaheuristic [J].
Souza, Vitor A. A. ;
Melo, Rafael A. ;
Mateus, Geraldo R. .
APPLIED SOFT COMPUTING, 2024, 161
[28]   A multi-criteria cross-docking scheduling with just-in-time approach [J].
A. R. Boloori Arabani ;
S. M. T. Fatemi Ghomi ;
M. Zandieh .
The International Journal of Advanced Manufacturing Technology, 2010, 49 :741-756
[29]   A multi-objective electromagnetism algorithm for a bi-objective flowshop scheduling problem [J].
Khalili, Majid ;
Tavakkoli-Moghaddam, Reza .
JOURNAL OF MANUFACTURING SYSTEMS, 2012, 31 (02) :232-239
[30]   A multi-criteria cross-docking scheduling with just-in-time approach [J].
Arabani, A. R. Boloori ;
Ghomi, S. M. T. Fatemi ;
Zandieh, M. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8) :741-756