An Activity-Based Costing Model for Additive Manufacturing

被引:4
作者
Jarrar, Qussay [1 ]
Belkadi, Farouk [1 ]
Bernard, Alain [1 ]
机构
[1] Ecole Cent Nantes, Lab Digital Sci Nantes, LS2N UMR 6004, Nantes, France
来源
PRODUCT LIFECYCLE MANAGEMENT: GREEN AND BLUE TECHNOLOGIES TO SUPPORT SMART AND SUSTAINABLE ORGANIZATIONS, PT I | 2022年 / 639卷
关键词
Cost model; Cost estimation; Cost drivers; Activity based costing; Additive manufacturing; TECHNOLOGY; MANAGEMENT;
D O I
10.1007/978-3-030-94335-6_35
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Additive Manufacturing (AM) has received a high interest in various applications, especially Powder Bed Fusion (PBF) technology. As for any industrial process, cost is one of the most important key performance indicators where good estimation and management have a direct impact on the competitiveness of the enterprise. Therefore, a detailed analysis of the current AM processes cost is essential. This paper has two main contributions, firstly, a critical analysis of the existing cost models in PBF, and metal-based material AM technologies by illustrating their main cost drivers and formulas. Secondly, an Activity-Based Costing (ABC) model is proposed with the aim to cover all important characteristics of AM process. The main cost drivers in AM process are exploited in this model to support the quotation of new product at earlier stages of AM project negotiation. The proposed costing model is part of a global knowledge-based framework for decision aid in AM project.
引用
收藏
页码:492 / 507
页数:16
相关论文
共 50 条
  • [41] Study on Costing of Power Grid Enterprises Base on Activity-Based Costing
    Zhang Ge
    Yao Dan
    Xia Xiaowen
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE OF MANAGEMENT SCIENCE AND INFORMATION SYSTEM, VOLS 1-4, 2009, : 1231 - 1235
  • [42] Target Costing and Activity-Based Cost of Supply Chain Costing Study
    Fang, Li-na
    Ning, Ying
    Wang, Ya-dong
    INTERNATIONAL CONFERENCE ON COMPUTER, NETWORK SECURITY AND COMMUNICATION ENGINEERING (CNSCE 2014), 2014, : 582 - 586
  • [43] Research on Activity-based Costing Model Based on Consumption Chain in Iron and Steel Enterprise
    Zhang, H.
    Dong, H. B.
    INTERNATIONAL CONFERENCE ON AUTOMATION, MECHANICAL AND ELECTRICAL ENGINEERING (AMEE 2015), 2015, : 1011 - 1018
  • [44] Simulation study integrated with activity-based costing for an electronic device re-manufacturing system
    Calvi, Kevin
    Halawa, Farouq
    Economou, Manthos
    Kulkarni, Rohan
    Chung, Sung Hoon
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 103 (1-4) : 127 - 140
  • [45] Simulation study integrated with activity-based costing for an electronic device re-manufacturing system
    Kevin Calvi
    Farouq Halawa
    Manthos Economou
    Rohan Kulkarni
    Sung Hoon Chung
    The International Journal of Advanced Manufacturing Technology, 2019, 103 : 127 - 140
  • [46] Process-Based Governance in Public Administrations Using Activity-Based Costing
    Becker, Joerg
    Bergener, Philipp
    Raeckers, Michael
    ELECTRONIC GOVERNMENT, PROCEEDINGS, 2009, 5693 : 176 - 187
  • [47] Machine Learning Activity-Based Costing: Can Activity-Based Costing's First-Stage Allocation Be Replaced with a Neural Network?
    Knox, Brian D.
    JOURNAL OF EMERGING TECHNOLOGIES IN ACCOUNTING, 2023, 20 (02) : 95 - 117
  • [48] Introducing Activity-Based Costing in Farm Management: The Design of the FarmBO System
    Carli, Giacomo
    Canavari, Maurizio
    Grandi, Alessandro
    INTERNATIONAL JOURNAL OF AGRICULTURAL AND ENVIRONMENTAL INFORMATION SYSTEMS, 2014, 5 (04) : 69 - 84
  • [49] Time-driven activity-based costing in a production planning environment
    Bagherpour, Morteza
    Nia, Afshin Kamyab
    Sharifian, Mehdi
    Mazdeh, Mohammad Mahdavi
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2013, 227 (B2) : 333 - 337
  • [50] Factors Influencing Activity-Based Costing Success: A Review
    Fei, Zhang Yi
    Isa, Che Ruhana
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON BUSINESS, ECONOMICS AND TOURISM MANAGEMENT, 2010, : 96 - 100