First results of the new endcap TOF commissioning at BESIII

被引:6
|
作者
Wu, Z. [1 ,2 ]
Sun, S. [1 ,2 ]
Heng, Y. [1 ,2 ]
Wang, X. [1 ,2 ,3 ]
Sun, Y. [2 ,3 ]
Li, C. [2 ,3 ]
Liu, Z. [2 ,3 ]
Dai, H. [1 ,2 ]
Zhang, J. [1 ,2 ]
Cao, P. [2 ,3 ]
Sun, W. [2 ,3 ]
Wang, S. [2 ,3 ]
Wang, Y. [2 ,3 ]
Ji, X. [1 ,2 ]
Zhao, J. [1 ,2 ]
Gong, W. [1 ,2 ]
Chen, M. [1 ,2 ]
Ye, M. [1 ,2 ]
Qiu, Y. [1 ,2 ]
Ma, X. [1 ,2 ]
Xu, M. [1 ,2 ]
Luo, X. [1 ,2 ]
Li, J. [1 ,2 ]
Yang, R. [1 ,2 ,3 ]
An, F. [1 ,2 ]
An, Q. [2 ,3 ]
Jiang, X. [1 ,2 ]
Liu, Zhen-an [1 ,2 ]
Liu, S. [2 ,3 ]
Zhu, K. [1 ,2 ]
机构
[1] Inst High Energy Phys, Expt Phys Ctr, 19B Yuquan Rd, Beijing 100049, Peoples R China
[2] USTC, IHEP, State Key Lab Particle Detect & Elect, Hefei, Peoples R China
[3] USTC, Dept Modern Phys, JinZhai Rd 96, Hefei 230026, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Instrumentation and methods for time-of-flight (TOF) spectroscopy; Spectrometers; Resistive-plate chambers; PROTOTYPE; MRPC; DETECTOR; SYSTEM;
D O I
10.1088/1748-0221/11/07/C07005
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished in October 2015. The first results of the MRPCs commissioning at BESIII are reported in this paper.
引用
收藏
页数:8
相关论文
共 50 条
  • [1] The Upgrade of Endcap TOF in BESIII
    Wu, Zhi
    PROCEEDINGS OF THE 21ST PARTICLES AND NUCLEI INTERNATIONAL CONFERENCE (PANIC 2017), 2018, 46
  • [2] First results of the RPC commissioning at BESIII
    Xie, Yuguang
    Zhang, Jiawen
    Chen, Jin
    Han, Jifeng
    Qian, Sen
    Liang, Hao
    Zhou, Yongzhao
    Liang, Yutie
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2009, 599 (01): : 20 - 27
  • [3] R&D of the endcap TOF detector for BESIII
    Tang, ZB
    Li, X
    An, SH
    Chen, HF
    Heng, YK
    Li, C
    Shao, M
    Sun, YJ
    Wang, YF
    Wu, C
    Zeng, H
    Zhao, L
    Zhao, XJ
    HIGH ENERGY PHYSICS AND NUCLEAR PHYSICS-CHINESE EDITION, 2006, 30 (05): : 445 - 448
  • [4] Study of MRPC technology for BESIII endcap-TOF upgrade
    Li X.
    Sun Y.
    Li C.
    Liu Z.
    Heng Y.
    Shao M.
    Wang X.
    Wu Z.
    Cao P.
    Chen M.
    Dai H.
    Liu S.
    Luo X.
    Jiang X.
    Sun S.
    Tang Z.
    Sun W.
    Wang S.
    Xu M.
    Yang R.
    Zhu K.
    Radiation Detection Technology and Methods, 2017, 1 (2)
  • [5] Prototype of time digitizing system for BESIII endcap TOF upgrade
    Cao Ping
    Sun Wei-Jia
    Ji Xiao-Lu
    Fan Huan-Huan
    Wang Si-Yu
    Liu Shu-Bin
    An Qi
    CHINESE PHYSICS C, 2014, 38 (04)
  • [6] A GEANT4 simulation study of BESIII endcap TOF upgrade
    Zhang Hui
    Shao Ming
    Li Cheng
    Chen Hong-Fang
    Heng Yue-Kun
    Sun Yong-Jie
    Tang Ze-Bo
    Ji Chang-Sheng
    Chen Tian-Xiang
    Yang Shuai
    CHINESE PHYSICS C, 2013, 37 (09)
  • [7] First commissioning results of ALICE-TOF SuperModules
    A. Akindinov
    A. Alici
    P. Antonioli
    S. Arcelli
    Y. W. Baek
    M. Basile
    G. Cara Romeo
    L. Cifarelli
    F. Cindolo
    A. De Caro
    D. De Gruttola
    S. De Pasquale
    M. Fusco Girard
    C. Guarnaccia
    D. Hatzifotiadou
    H. T. Jung
    W. W. Jung
    D. S. Kim
    D. W. Kim
    H. N. Kim
    J. S. Kim
    S. Kiselev
    G. Laurenti
    K. Lee
    S. C. Lee
    M. L. Luvisetto
    D. Malkevich
    A. Margotti
    R. Nania
    A. Nedosekin
    F. Noferini
    P. Pagano
    A. Pesci
    O. Pinazza
    R. Preghenella
    G. Russo
    M. Ryabinin
    E. Scapparone
    G. Scioli
    A. Silenzi
    M. Tchoumakov
    K. Voloshin
    M. C. S. Williams
    B. Zagreev
    C. Zampolli
    A. Zichichi
    Indian Journal of Physics, 2011, 85 : 1155 - 1159
  • [8] First commissioning results of ALICE-TOF SuperModules
    Akindinov, A.
    Alici, A.
    Antonioli, P.
    Arcelli, S.
    Baek, Y. W.
    Basile, M.
    Romeo, G. Cara
    Cifarelli, L.
    Cindolo, F.
    De Caro, A.
    De Gruttola, D.
    De Pasquale, S.
    Giard, M. Fusco
    Guarnaccia, C.
    Hatzifotiadou, D.
    Jung, H. T.
    Jung, W. W.
    Kim, D. S.
    Kim, D. W.
    Kim, H. N.
    Kim, J. S.
    Kiselev, S.
    Laurenti, G.
    Lee, K.
    Lee, S. C.
    Luvisetto, M. L.
    Malkevich, D.
    Margotti, A.
    Nania, R.
    Nedosekin, A.
    Noferini, F.
    Pagano, P.
    Pesci, A.
    Pinazza, O.
    Preghenella, R.
    Russo, G.
    Ryabinin, M.
    Scapparone, E.
    Scioli, G.
    Silenzi, A.
    Tchoumakov, M.
    Voloshin, K.
    Williams, M. C. S.
    Zagreev, B.
    Zampolli, C.
    Zichichi, A.
    INDIAN JOURNAL OF PHYSICS, 2011, 85 (07) : 1155 - 1159
  • [9] The NEW detector: construction, commissioning and first results
    Nebot-Guinot, M.
    XXVII INTERNATIONAL CONFERENCE ON NEUTRINO PHYSICS AND ASTROPHYSICS (NEUTRINO2016), 2017, 888
  • [10] Simulation of the BESIII endcap time of flight upgrade
    Ullrich, M.
    Kuehn, W.
    Liang, Y.
    Spruck, B.
    Werner, M.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2015, 769 : 32 - 36