GA-based multi-objective optimization of finance-based construction project scheduling

被引:40
|
作者
Fathi, Habib [1 ]
Afshar, Abbas [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Civil Engn, Tehran 16846, Iran
关键词
financial management; cash flow; multi-objective optimization; genetic algorithm; construction management; financial decisions making; TIME-COST OPTIMIZATION; IMPROVED GENETIC ALGORITHMS; CASH-FLOW;
D O I
10.1007/s12205-010-0849-2
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
From a financial management perspective, the profitability of a construction project is connected to the cash requirements of the project and the ability of a company to procure cash at the right time. Line of credit as a bank credit agreement provides an alternative way of managing the necessary capital and cash flow for the project. Today's highly competitive business environment necessitates comprehensive scheduling with respect to cash providing provisions and restrictions. This paper presents a multi-objective elitist Non-dominated Sorting Genetic Algorithm (NSGA-II) based optimization model for finance-based scheduling which facilitates the decision making process of the most appropriate line of credit option for cash procurement. Finance-based scheduling modifies the initial schedule of the project so that its maximum negative cash flow is limited to a specific credit limit. Furthermore, this paper suggests several improvements to basic NSGA-II and demonstrates how they significantly enhance the efficiency of the model in searching for non-dominated solutions. The proposed model is validated by a designed benchmark problem, and its performance and merits are illustrated through its application to a case example. It is shown that the model can effectively approach to the optimal Pareto set and maintain diversity in solutions.
引用
收藏
页码:627 / 638
页数:12
相关论文
共 50 条
  • [31] GA-based implicit stochastic optimization and RNN-based simulation for deriving multi-objective reservoir hedging rules
    Khadr, Mosaad
    Schlenkhoff, Andreas
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021, 28 (15) : 19107 - 19120
  • [32] Multi-objective Optimization in Construction Project Based on a Hierarchical Subpopulation Particle Swarm Optimization Algorithm
    Wang, Weibo
    Feng, Quanyuan
    2008 INTERNATIONAL SYMPOSIUM ON INTELLIGENT INFORMATION TECHNOLOGY APPLICATION, VOL I, PROCEEDINGS, 2008, : 746 - 750
  • [33] Construction of an economic environment scheduling system based on the multi-objective fuzzy optimization model
    Liu L.
    Applied Mathematics and Nonlinear Sciences, 2023, 8 (02) : 2495 - 2504
  • [34] A GA-based approach for solving fuzzy project scheduling
    Liu, Yan
    Zhao, Sheng-Li
    Zhang, Xi-Ping
    Du, Guang-Qian
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 3153 - +
  • [35] Interactive multi-objective vehicle routing via GA-based dynamic programming
    Khan, Raza Saleem
    Handl, Julia
    Yang, Jian-Bo
    3RD INTERNATIONAL CONFERENCE ON TRANSPORTATION INFORMATION AND SAFETY (ICTIS 2015), 2015, : 318 - 322
  • [36] GA-based multicriteria optimal model for construction scheduling
    Leu, SS
    Yang, CH
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (06): : 420 - 427
  • [37] Study on multi-objective optimization approach of construction project
    Zhao, Rui
    Liu, Xiao-Jun
    Shen, Jin-Shan
    Xi'an Jianzhu Keji Daxue Xuebao/Journal of Xi'an University of Architecture and Technology, 2008, 40 (06): : 858 - 862
  • [38] Research on Multi-Objective Optimization of Lean Construction Project
    Li Shuquan
    Zhu Kongguo
    2008 INTERNATIONAL CONFERENCE ON MULTIMEDIA AND INFORMATION TECHNOLOGY, PROCEEDINGS, 2008, : 480 - 483
  • [39] Multi-Objective Transportation Optimization Based on Lam-GA
    Zhang Hong-wei
    Li Jian-qiang
    Shu Hong-ping
    2009 IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTING AND INTELLIGENT SYSTEMS, PROCEEDINGS, VOL 1, 2009, : 214 - 217
  • [40] Multi-Objective Transportation Optimization Based on Tls-GA
    Zhang Hong-wei
    Lin Yong
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1324 - 1328