GA-based multi-objective optimization of finance-based construction project scheduling

被引:40
|
作者
Fathi, Habib [1 ]
Afshar, Abbas [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Civil Engn, Tehran 16846, Iran
关键词
financial management; cash flow; multi-objective optimization; genetic algorithm; construction management; financial decisions making; TIME-COST OPTIMIZATION; IMPROVED GENETIC ALGORITHMS; CASH-FLOW;
D O I
10.1007/s12205-010-0849-2
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
From a financial management perspective, the profitability of a construction project is connected to the cash requirements of the project and the ability of a company to procure cash at the right time. Line of credit as a bank credit agreement provides an alternative way of managing the necessary capital and cash flow for the project. Today's highly competitive business environment necessitates comprehensive scheduling with respect to cash providing provisions and restrictions. This paper presents a multi-objective elitist Non-dominated Sorting Genetic Algorithm (NSGA-II) based optimization model for finance-based scheduling which facilitates the decision making process of the most appropriate line of credit option for cash procurement. Finance-based scheduling modifies the initial schedule of the project so that its maximum negative cash flow is limited to a specific credit limit. Furthermore, this paper suggests several improvements to basic NSGA-II and demonstrates how they significantly enhance the efficiency of the model in searching for non-dominated solutions. The proposed model is validated by a designed benchmark problem, and its performance and merits are illustrated through its application to a case example. It is shown that the model can effectively approach to the optimal Pareto set and maintain diversity in solutions.
引用
收藏
页码:627 / 638
页数:12
相关论文
共 50 条
  • [21] Process scheduling for prefabricated construction based on multi-objective optimization algorithm
    Li, Yan
    Wu, Jiajun
    Hao, Yi
    Gao, Yuchen
    Chai, Runqi
    Chai, Senchun
    Zhang, Baihai
    AUTOMATION IN CONSTRUCTION, 2024, 168
  • [22] Optimum Finance-Based Scheduling
    Akin, Firat Dogu
    Damci, Atilla
    Arditi, David
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (09)
  • [23] Finance-based scheduling of construction projects using integer programming
    Elazouni, AM
    Gab-Allah, AA
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01): : 15 - 24
  • [24] A GA-based multi-objective decision making for optimal vehicle transportation
    Lin, Jeng-Jong
    JOURNAL OF INFORMATION SCIENCE AND ENGINEERING, 2008, 24 (01) : 237 - 260
  • [25] Modified GA-based Optimizer for Multi-objective Product Family Design
    Zhuo, Liu
    San, Wong Yoke
    Seng, Lee Kim
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON AUTONOMOUS ROBOTS AND AGENTS, 2009, : 243 - 248
  • [26] Research on multi-objective optimization of Construction Project based on Ant Colony Algorithm
    Tan Fei
    Hu Heng
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1900 - 1906
  • [27] Multi-objective Optimization of Construction Project Based on Improved Ant Colony Algorithm
    Li, Yancang
    Wang, Shuren
    He, Yongsheng
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2020, 27 (01): : 184 - 190
  • [28] Finance-based scheduling: optimization of results-based funded multiple projects
    Zahran, Kareem
    Ezeldin, A. Samer
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2020, 47 (04) : 428 - 437
  • [29] GA-based implicit stochastic optimization and RNN-based simulation for deriving multi-objective reservoir hedging rules
    Mosaad Khadr
    Andreas Schlenkhoff
    Environmental Science and Pollution Research, 2021, 28 : 19107 - 19120
  • [30] GA-based Resource-Constrained Project Scheduling with the Objective of Minimizing Activities' Cost
    Liu, ZY
    Wang, HW
    ADVANCES IN INTELLIGENT COMPUTING, PT 1, PROCEEDINGS, 2005, 3644 : 937 - 946