Investigating Wind Generation Investment Indices in Multi-Stage Planning

被引:0
作者
Valinejad, Jaber [1 ]
Marzband, Mousa [2 ]
Busawon, Krishna [2 ]
Kyyra, Jorma [3 ]
Pouresmaeil, Edris [3 ]
机构
[1] Virginia Tech, Bradley Dept Elect & Comp Engn, Falls Church, VA 22043 USA
[2] Northumbria Univ, Dept Phys & Elect Engn, Newcastle Upon Tyne, Tyne & Wear, England
[3] Aalto Univ, Dept Elect Engn & Automat, Espoo, Finland
来源
2018 5TH INTERNATIONAL SYMPOSIUM ON ENVIRONMENT-FRIENDLY ENERGIES AND APPLICATIONS (EFEA) | 2018年
关键词
capacity investment; power market; wind; dynamic planning; stochastic approach; SMART TRANSACTIVE ENERGY; ELECTRICITY MARKET; HOME-MICROGRIDS; POWER; MANAGEMENT; FRAMEWORK; DEMAND; SYSTEM;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper presents a Multi-stage stochastic bi-level model for the expansion planning of Wind resources in power systems at a multi-stage horizon. In this paper, the power system consists of a combination of fossil fuel technologies and Wind resources for investment. Demand is characterized by a certain number of demand blocks. The uncertainty of demand for each this block (for each time period of the curve) is determined by the scenario. Afterwards, the suggested model is converted to a mathematical programming with some equilibrium constraints. Following that, after linearization, a mixed integer linear program is obtained. This framework is examined on the IEEE RTS 24-bus network. The obtained simulation results confirm that this model can be appropriately used as a means to analyze the behavior of investments in wind and thermal units.
引用
收藏
页数:6
相关论文
共 26 条
[11]   Assessment of wind power predictability as a decision factor in the investment phase of wind farms [J].
Girard, R. ;
Laquaine, K. ;
Kariniotakis, G. .
APPLIED ENERGY, 2013, 101 :609-617
[12]   The IEEE reliability test system - 1996 [J].
Grigg, C ;
Wong, P ;
Albrecht, P ;
Allan, R ;
Bhavaraju, M ;
Billinton, R ;
Chen, Q ;
Fong, C ;
Haddad, S ;
Kuruganty, S ;
Li, W ;
Mukerji, R ;
Patton, D ;
Rau, N ;
Reppen, D ;
Schneider, A ;
Shahidehpour, M ;
Singh, C .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) :1010-1018
[13]  
Hobbs BF., 2000, IEEE T POWER SYST, V15, P638
[14]   Robust Transmission Network Expansion Planning With Uncertain Renewable Generation and Loads [J].
Jabr, R. A. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (04) :4558-4567
[15]   Smart transactive energy framework in grid-connected multiple home microgrids under independent and coalition operations [J].
Marzband, Mousa ;
Azarinejadian, Fatemeh ;
Savaghebi, Mehdi ;
Pouresmaeil, Edris ;
Guerrero, Josep M. ;
Lightbody, Gordon .
RENEWABLE ENERGY, 2018, 126 :95-106
[16]   Framework for smart transactive energy in home-microgrids considering coalition formation and demand side management [J].
Marzband, Mousa ;
Fouladfar, Mohammad Hossein ;
Akorede, Mudathir Funsho ;
Lightbody, Gordon ;
Pouresmaeil, Edris .
SUSTAINABLE CITIES AND SOCIETY, 2018, 40 :136-154
[17]   An advanced retail electricity market for active distribution systems and home microgrid interoperability based on game theory [J].
Marzband, Mousa ;
Javadi, Masoumeh ;
Pourmousavi, S. Ali ;
Lightbody, Gordon .
ELECTRIC POWER SYSTEMS RESEARCH, 2018, 157 :187-199
[18]   Experimental validation of a real time energy management system for microgrids in islanded mode using a local day-ahead electricity market and MINLP [J].
Marzband, Mousa ;
Sumper, Andreas ;
Dominguez-Garcia, Jose Luis ;
Gumara-Ferret, Ramon .
ENERGY CONVERSION AND MANAGEMENT, 2013, 76 :314-322
[19]   Combining tariffs, investment subsidies and soft loans in a renewable electricity deployment policy [J].
Mir-Artigues, Pere ;
del Rio, Pablo .
ENERGY POLICY, 2014, 69 :430-442
[20]  
Momoh J., 2009, Economic Market Design and Planning for Electric Power Systems