Load management in the Indian power sector using US experience

被引:15
作者
Banerjee, R [1 ]
机构
[1] Carnegie Mellon Univ, Dept Engn & Publ Policy, Pittsburgh, PA 15213 USA
关键词
D O I
10.1016/S0360-5442(98)00052-8
中图分类号
O414.1 [热力学];
学科分类号
摘要
India has a scarcity of electric power during peak-use periods, Most Indian utilities resort to load shedding (LS) to manage the peak demand. A review of US experience with direct load control and interruptible or time-of-use (TOU) tariffs shows successful programs. Direct load control of agricultural pumps, commercial air conditioners and interruptible or TOU tariffs in the industrial sector are identified as useful options for India. Implementation strategies for these are suggested. Load management (LM) by Indian utilities may provide a better solution to the current peak power shortage than mandatory LS. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:961 / 972
页数:12
相关论文
共 55 条
  • [1] Atkinson S., 1979, J ECONOMETRICS, V9, P79, DOI DOI 10.1016/0304-4076(79)90097-6
  • [2] BANERJEE R, 1995, ECON POLIT WEEKLY, V30, P55
  • [3] *CA EN COAL EN COO, 1992, 9 IRT TECHN INC RES
  • [4] LOAD IMPACT OF INTERRUPTIBLE AND CURTAILABLE RATE PROGRAMS - EVIDENCE FROM 10 UTILITIES
    CAVES, DW
    HERRIGES, JA
    HANSER, P
    WINDLE, RJ
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (04) : 1757 - 1763
  • [5] INTERRUPTIBLE LOAD CONTROL FOR TAIWAN POWER COMPANY
    CHEN, CS
    LEU, JT
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (02) : 460 - 465
  • [6] RESCHEDULING ELECTRICITY DEMANDS IN DOMESTIC BUILDINGS
    DEERING, S
    NEWBOROUGH, M
    PROBERT, SD
    [J]. APPLIED ENERGY, 1993, 44 (01) : 1 - 62
  • [7] *EPRI RES TRIANGL, 1985, EA4206 EPRI RES TRIA
  • [8] ETO J, 1996, LBLN39931
  • [9] THE RESIDENTIAL DEMAND FOR ELECTRICITY BY TIME-OF-USE - A SURVEY OF 12 EXPERIMENTS WITH PEAK LOAD PRICING
    FARUQUI, A
    MALKO, JR
    [J]. ENERGY, 1983, 8 (10) : 781 - 795
  • [10] *FL POW CORP RES L, 1992, 54 IRT TECHN INC RES