Decentralized and Collaborative Scheduling Approach for Active Distribution Network with Multiple Virtual Power Plants

被引:8
作者
Li, Xiangyu [1 ]
Zhao, Dongmei [1 ]
Guo, Baicang [2 ]
机构
[1] North China Elect Power Univ, Sch Elect & Elect Engn, Beijing 102206, Peoples R China
[2] Jilin Univ, Transportat Coll, Changchun 130012, Jilin, Peoples R China
关键词
active distribution system; virtual power plant; stochastic optimization; decentralized and collaborative optimization; FLOW; RELAXATION;
D O I
10.3390/en11113208
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In order to build an active distribution system with multi virtual power plants (VPP), a decentralized two-stage stochastic dispatching model based on synchronous alternating direction multiplier method (SADMM) was proposed in this paper. Through the integration of distributed energy and large-scale electric vehicles (EV) in the distribution network by VPP group, coordinative complementarity, and global optimization were realized. On the premise of energy autonomy management of active distribution network (AND) and VPP, after ensuring the privacy of stakeholders, the power of tie-line was taken as decoupling variable based on SADMM. Furthermore, without the participation of central coordinators, the optimization models of VPPs and distribution networks were decoupled to achieve fully decentralized optimization. Aiming at minimizing their own operating costs, the VPPs aggregate distributed energy and large-scale EVs within their jurisdiction to interact with the upper distribution network. On the premise of keeping operation safe, the upper distribution network formulated the energy interaction plan with each VPP, and then, the global energy optimization management of the entire distribution system and the decentralized autonomy of each VPP were achieved. In order to improve the stochastic uncertainty of distributed renewable energy output, a two-stage stochastic optimization method including pre-scheduling stage and rescheduling stage was adopted. The pre-scheduling stage was used to arrange charging and discharging plans of EV agents and output plans of micro gas turbines. The rescheduling stage was used to adjust the spare resources of micro gas turbines to deal with the uncertainty of distributed wind and light. An example of active distribution system with multi-VPPs was constructed by using the improved IEEE 33-bus system, then the validity of the model was verified.
引用
收藏
页数:18
相关论文
共 25 条
[21]   A bi-level economy dispatch model considering temporal and spatial optimal distribution of electric vehicles [J].
Zhang, Qian ;
Liu, Chao ;
Zhou, Lin ;
Li, Chunyan ;
Gan, Xi .
Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2014, 38 (20) :40-45
[22]  
Zhang Y., 2014, P 6 ANN IEEE GREEN T
[23]  
[赵文猛 Zhao Wenmeng], 2015, [电网技术, Power System Technology], V39, P1847
[24]   Multi-area Generation-reserve Joint Dispatch Approach Considering Wind Power Cross-regional Accommodation [J].
Zhou, Ming ;
Wang, Mu ;
Li, Jianfeng ;
Li, Gengyin .
CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2017, 3 (01) :74-83
[25]  
Zhuang H.D., 2014, T CHINA ELECTROTEC S, V29, P365, DOI [10.19595/j.cnki.1000-6753.tces.2014.s1.051, DOI 10.19595/J.CNKI.1000-6753.TCES.2014.S1.051]