Impact of the Corrective Maintenance Cost on Manufacturing Remanufacturing System Performance

被引:0
作者
Turki, Sadok [1 ]
Hajej, Zied [1 ]
Rezg, Nidhal [1 ]
机构
[1] Univ Lorraine, LGIPM, F-57045 Metz, France
来源
MODELLING, COMPUTATION AND OPTIMIZATION IN INFORMATION SYSTEMS AND MANAGEMENT SCIENCES - MCO 2015 - PT II | 2015年 / 360卷
关键词
Manufacturing-remanufacturing system; discrete flow model; corrective maintenance; returned products; PERTURBATION ANALYSIS;
D O I
10.1007/978-3-319-18167-7_24
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper studies a manufacturing remanufacturing system composed by two parallel machines, a serviceable inventory, a remanufacturing inventory and a customer which demands a constant quantity of part. Taking into account the return of the used part and the maintenance action, discrete flow model is used to model and to simulate the system. The goal of this work is to evaluate the optimal serviceable inventory level which allows minimizing the sum of inventory, lost sales costs and the corrective maintenance cost. Numerical results are presented to show the impact of the corrective maintenance cost on the optimal serviceable inventory level.
引用
收藏
页码:275 / 281
页数:7
相关论文
共 13 条
[1]   OPTIMAL-CONTROL OF PRODUCTION-RATE IN A FAILURE PRONE MANUFACTURING SYSTEM [J].
AKELLA, R ;
KUMAR, PR .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1986, 31 (02) :116-126
[2]  
[Anonymous], 18 IEEE C EM TECHN F
[3]  
[Anonymous], 2014, 11 IEEE INT C NETW S
[4]   Bayesian inference for network-based models with a linear inverse structure [J].
Hazelton, Martin L. .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2010, 44 (05) :674-685
[5]  
Rubio S, 2008, COMPUTERS IND ENG, V44, P345
[6]   Optimal production planning for a multi-product closed loop system with uncertain demand and return [J].
Shi, Jianmai ;
Zhang, Guoqing ;
Sha, Jichang .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (03) :641-650
[7]  
Turki Sadok, 2012, International Journal of Advanced Operations Management, V4, P124, DOI 10.1504/IJAOM.2012.045894
[8]   Perturbation analysis for continuous and discrete flow models: a study of the delivery time impact on the optimal buffer level [J].
Turki, Sadok ;
Hennequin, Sophie ;
Sauer, Nathalie .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (13) :4011-4044
[9]  
Vasic J, 2011, LECT NOTES COMPUT SC, V6782, P602
[10]   IPA for continuous stochastic marked graphs [J].
Wardi, Y. ;
Giua, A. ;
Seatzu, C. .
AUTOMATICA, 2013, 49 (05) :1204-1215