共 50 条
- [1] Product cooperative disassembly sequence planning based on branch-and-bound algorithm The International Journal of Advanced Manufacturing Technology, 2010, 51 : 1139 - 1147
- [3] Product cooperative disassembly sequence and task planning based on genetic algorithm INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 105 (5-6): : 2103 - 2120
- [4] Product cooperative disassembly sequence and task planning based on genetic algorithm The International Journal of Advanced Manufacturing Technology, 2019, 105 : 2103 - 2120
- [5] BRANCH-AND-BOUND ALGORITHM FOR INTERFACE-BASED MODULAR PRODUCT DESIGN PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2012, VOL 2, PTS A AND B, 2012, : 287 - 296
- [7] Product disassembly sequence planning based on ant colony algorithm Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2006, 12 (09): : 1431 - 1437
- [9] Genetic algorithm for product disassembly sequence planning 2006 IEEE INTERNATIONAL CONFERENCE ON ENGINEERING OF INTELLIGENT SYSTEMS, 2006, : 448 - +