Dynamic Life Cycle Assessments of a Conventional Green Building and a Net Zero Energy Building: Exploration of Static, Dynamic, Attributional, and Consequential Electricity Grid Models

被引:38
作者
Collinge, William O. [1 ]
Rickenbacker, Harold J. [1 ]
Landis, Amy E. [2 ]
Thiel, Cassandra L. [3 ]
Bilec, Melissa M. [1 ]
机构
[1] Univ Pittsburgh, Dept Civil & Environm Engn, 153 Benedum Hall,3700 OHara St, Pittsburgh, PA 15261 USA
[2] Colorado Sch Mines, Dept Civil & Environm Engn, 206 Coolbaugh Hall,1012 14th St, Golden, CO 80401 USA
[3] NYU, Dept Populat Hlth, Sch Med, 227 East 30th St 609, New York, NY 10016 USA
基金
美国国家科学基金会;
关键词
UNITED-STATES; ENVIRONMENTAL IMPACTS; RESIDENTIAL BUILDINGS; LCA; PERFORMANCE; SYSTEM; PERSPECTIVE; CHALLENGES; EMISSIONS; CARBON;
D O I
10.1021/acs.est.7b06535
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Our study assesses the differences between regional average- and marginal-electricity generation mixes as well as the variability between predicted and observed energy consumption of a "conventional green" Leadership in Energy and Environmental Design (LEED) building and a Net-Zero Energy Living Building (NZEB). The aim of our study was to evaluate the importance of using temporally resolved building-level data while capturing the dynamic effects a changing electrical grid has on the life cycle impacts of buildings. Two static and four dynamic life cycle assessment (LCA) models were evaluated for both buildings. Both buildings' results show that the most appropriate models (hybrid consequential for the LEED Gold building, hourly consequential for the NZEB) significantly modified the use-phase global warming potential (GWP) impacts relative to the design static LCA (49% greater impact for the LEED Gold building; 45% greater reduction for the NZEB). In other words, a "standard" LCA would underestimate the use phase impacts of the LEED Gold building and the benefits of the NZEB in the GWP category. Although the results in this paper are specific to two case study buildings, the methods developed are scalable and can be implemented more widely to improve building life cycle impact estimates.
引用
收藏
页码:11429 / 11438
页数:10
相关论文
共 44 条
[1]   On-Site Renewable Energy and Green Buildings: A System-Level Analysis [J].
Al-Ghamdi, Sami G. ;
Bilec, Melissa M. .
ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2016, 50 (09) :4606-4614
[2]   Life-Cycle Thinking and the LEED Rating System: Global Perspective on Building Energy Use and Environmental Impacts [J].
Al-Ghamdi, Sami G. ;
Bilec, Melissa M. .
ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2015, 49 (07) :4048-4056
[3]  
[Anonymous], 2010, Monthly Energy Review
[4]  
[Anonymous], 2013, 158042012A1 EN EUR C
[5]   TRACI 2.0: the tool for the reduction and assessment of chemical and other environmental impacts 2.0 [J].
Bare, Jane .
CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2011, 13 (05) :687-696
[6]   Using Nested Average Electricity Allocation Protocols to Characterize Electrical Grids in Life Cycle Assessment [J].
Colett, Joseph S. ;
Kelly, Jarod C. ;
Keoleian, Gregory A. .
JOURNAL OF INDUSTRIAL ECOLOGY, 2016, 20 (01) :29-41
[7]   Integrating life cycle assessment with green building and product rating systems: North American perspective [J].
Collinge, W. O. ;
Thiel, C. L. ;
Campion, N. A. ;
Al-Ghamdi, S. G. ;
Woloschin, C. L. ;
Soratana, K. ;
Landis, A. E. ;
Bilec, M. M. .
DEFINING THE FUTURE OF SUSTAINABILITY AND RESILIENCE IN DESIGN, ENGINEERING AND CONSTRUCTION, 2015, 118 :662-669
[8]   Dynamic life cycle assessment: framework and application to an institutional building [J].
Collinge, William O. ;
Landis, Amy E. ;
Jones, Alex K. ;
Schaefer, Laura A. ;
Bilec, Melissa M. .
INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2013, 18 (03) :538-552
[9]   Consideration of marginal electricity in real-time minimization of distributed data centre emissions [J].
Dandres, Thomas ;
Moghaddam, Reza Farrahi ;
Kim Khoa Nguyen ;
Lemieux, Yves ;
Samson, Rejean ;
Cheriet, Mohamed .
JOURNAL OF CLEANER PRODUCTION, 2017, 143 :116-124
[10]   Exploration of life cycle data calculation: Lessons from a Passivhaus case study [J].
Din, Asif ;
Brotas, Luisa .
ENERGY AND BUILDINGS, 2016, 118 :82-92