摘要
Models and optimisation approaches are developed for a flexible job shop scheduling problem with lot streaming and lot sizing of the variable sublots. A two-stage optimisation procedure is proposed. First, the makespan value is minimised with the smallest sublots defined for the problem instance. This makes it possible to shorten the makespan significantly, because each sublot is transferred separately to the next operation of a job. In the second stage, the sizes of the sublots are maximised without increasing the obtained makespan value. In this way, the quantity of sublots and transport activities is limited together with the related manufacturing cost. Two objectives are defined for the second stage. The first one is the maximisation of the sum of the sublot sizes of all operations, the second one is the maximisation of the number of the operations which do not need to be split at all. Mixed-integer linear programming, constraint programming and graph-based models are implemented for the problem. Two optimisation approaches are developed and compared in computational experiments for each stage and objective, one approach is based on a third-party solver, and the second one on an independent own implementation, namely a tabu search and a greedy constructive heuristic.
引用
收藏
页码:6391 / 6411
页数:21
相关论文
共 50 条
[31]   Survey of integrated flexible job shop scheduling problems [J].
Li, Xixing ;
Guo, Xing ;
Tang, Hongtao ;
Wu, Rui ;
Wang, Lei ;
Pang, Shibao ;
Liu, Zhengchao ;
Xu, Wenxiang ;
Li, Xin .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 174
[32]   Mathematical modelling and a meta-heuristic for flexible job shop scheduling [J].
Roshanaei, V. ;
Azab, Ahmed ;
ElMaraghy, H. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (20) :6247-6274
[33]   A Study on Integration of Lot Sizing and Flow Shop Lot Streaming Problems [J].
Mortezaei, Navid ;
Zulkifli, Norzima .
ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2014, 39 (12) :9283-9300
[34]   Constructing near optimal schedules for the flow-shop lot streaming problem with sublot-attached setups [J].
Kalir, AA ;
Sarin, SC .
JOURNAL OF COMBINATORIAL OPTIMIZATION, 2003, 7 (01) :23-44
[35]   A hierarchical integration scheduling method for flexible job shop with green lot splitting [J].
Gong, Qingshan ;
Li, Junlin ;
Jiang, Zhigang ;
Wang, Yan .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2024, 129
[36]   Constructing Near Optimal Schedules for the Flow-Shop Lot Streaming Problem with Sublot-Attached Setups [J].
Adar A. Kalir ;
Subhash C. Sarin .
Journal of Combinatorial Optimization, 2003, 7 :23-44
[37]   Lot streaming for product assembly in job shop environment [J].
Chan, F. T. S. ;
Wong, T. C. ;
Chan, L. Y. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2008, 24 (03) :321-331
[38]   Evolutionary algorithms for multi-objective flexible job shop cell scheduling [J].
Deliktas, Derya ;
Ozcan, Ender ;
Ustun, Ozden ;
Torkul, Orhan .
APPLIED SOFT COMPUTING, 2021, 113
[39]   Hybrid frameworks for flexible job shop scheduling [J].
Bharti, Puja ;
Jain, Sushma .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2020, 108 (5-6) :1563-1585
[40]   Flexible job shop scheduling with overlapping in operations [J].
Fattahi, Parviz ;
Jolai, Fariborz ;
Arkat, Jamal .
APPLIED MATHEMATICAL MODELLING, 2009, 33 (07) :3076-3087