Comparison of single-pier settlement model and multi-pier settlement model in solving train-track-bridge interaction

被引:18
作者
Chen, Zhaowei [1 ,2 ]
Bi, Lin [3 ]
Zhao, Jiangwei [4 ]
机构
[1] Chongqing Jiaotong Univ, Sch Mechanotron & Vehicle Engn, Chongqing, Peoples R China
[2] Southwest Jiaotong Univ, State Key Lab Tract Power, Chengdu, Sichuan, Peoples R China
[3] Chongqing Rail Transit Grp Co LTD, Chongqing, Peoples R China
[4] Bejing Urban Construct Design & Dev Grp Co LTD, Chongqing, Peoples R China
基金
中国博士后科学基金;
关键词
Pier settlement model; train-track-bridge interaction; rail deformation; static analysis; dynamic analysis; DYNAMIC INTERACTION; PERFORMANCE; VEHICLE; SAFETY;
D O I
10.1080/00423114.2020.1763406
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Pier settlement is unavoidable in bridge construction and operation processes, thus the influence of pier settlement on the train-track-bridge coupled system becomes a classic and meaningful topic in railway engineering. Aiming at this practical problem, three interesting works are conducted in this paper: (a) a detailed single-pier settlement model (SPSM) is developed with analytic method; (b) a multi-pier settlement model (MPSM) is also analytically established in detail; and (c) the influences of SPSM and MPSM on the train-track-bridge system are investigated and compared. On this basis, the application ranges for different pier settlement models are suggested from static and dynamic perspectives. Results show that, from static perspective, SPSM and MPSM have the similarity, and results obtained from MPSM are the superposition of results calculated by SPSM. Computational efficiency of MPSM is lower than that of SPSM due to the large model scale. SPSM is suggested to study the static performance of the coupled system and to perform parametric analysis in dynamic investigation, while MPSM is suggested to investigate the system dynamics in frequency-domain.
引用
收藏
页码:1484 / 1508
页数:25
相关论文
共 20 条
[1]   Dynamic interaction between vehicle and bridge deck subjected to support settlement [J].
Ahmari, Saeed ;
Yang, Mijia ;
Zhong, Hai .
ENGINEERING STRUCTURES, 2015, 84 :172-183
[2]   Conserving energy and momentum in nonlinear dynamics: A simple implicit time integration scheme [J].
Bathe, Klaus-Jurgen .
COMPUTERS & STRUCTURES, 2007, 85 (7-8) :437-445
[3]   Structural Performance of Bridge Approach Slabs under Given Embankment Settlement [J].
Cai, C. S. ;
Shi, X. M. ;
Voyiadjis, G. Z. ;
Zhang, Z. J. .
JOURNAL OF BRIDGE ENGINEERING, 2005, 10 (04) :482-489
[4]   Theoretical method of determining pier settlement limit value for China's high-speed railway bridges considering complete factors [J].
Chen, Zhaowei ;
Zhai, Wanming .
ENGINEERING STRUCTURES, 2020, 209
[5]   Influence of bridge-based designed TMD on running trains [J].
Chen, Zhaowei ;
Fang, Hui ;
Han, Zhaoling ;
Sun, Shizheng .
JOURNAL OF VIBRATION AND CONTROL, 2019, 25 (01) :182-193
[6]   Analysis of structural stresses of tracks and vehicle dynamic responses in train-track-bridge system with pier settlement [J].
Chen, Zhaowei ;
Zhai, Wanming ;
Yin, Qiang .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2018, 232 (02) :421-434
[7]   Study on the safe value of multi-pier settlement for simply supported girder bridges in high-speed railways [J].
Chen, Zhaowei ;
Zhai, Wanming ;
Tian, Guoying .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2018, 14 (03) :400-410
[8]   Safety threshold of high-speed railway pier settlement based on train-track-bridge dynamic interaction [J].
Chen ZhaoWei ;
Zhai WanMing ;
Cai ChengBiao ;
Sun Yu .
SCIENCE CHINA-TECHNOLOGICAL SCIENCES, 2015, 58 (02) :202-210
[9]   AE Monitoring and Numerical Simulation of a Two-span Model Masonry Arch Bridge Subjected to Pier Scour [J].
Invernizzi, S. ;
Lacidogna, G. ;
Manuello, A. ;
Carpinteri, A. .
STRAIN, 2011, 47 :158-169
[10]   Safety of Maglev Trains Moving on Bridges Subject to Foundation Settlements and Earthquakes [J].
Ju, S. H. ;
Leong, C. C. ;
Ho, Y. S. .
JOURNAL OF BRIDGE ENGINEERING, 2014, 19 (01) :91-100