Toward Reducing Construction Project Delivery Time under Limited Resources

被引:6
|
作者
Mohamed, Hossam H. [1 ]
Ibrahim, Ahmed H. [1 ]
Soliman, Asmaa A. [2 ]
机构
[1] Zagazig Univ, Fac Engn, Construct Engn & Util Dept, Zagazig 44519, Egypt
[2] Higher Technol Inst HTI, Civil Engn Dept, 10th Of Ramadan City 44629, Egypt
关键词
fast-tracking; AHP; rework time; !text type='Java']Java[!/text; construction schedule; REWORK; COST; DESIGN;
D O I
10.3390/su131911035
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
One of the most vital construction project aspects is to complete a project in minimum time restricted to the time-cost trade-off. Overlapping activities' planning and their impact on the project under limited resource constraints should be considered. This study aims to develop a model for optimizing the project schedule and cost regarding overlap activities and their impacts. This study reviews previous studies on changes in past activities likely to produce additional reworking of subsequent activities. In addition, an AHP model is developed to assess the reworking time of subsequent activities based on possible changes in previous activities. In addition, five realistic construction projects are applied. Finally, an optimizing model is developed for optimizing project time and cost using overlapping techniques by using the Java program. The results indicate that the proposed model can be used by project managers easily for solving time and cost optimization problems. In addition, it can be updated to continuously improve its functionality. Finally, it can be updated later to support AI for finding better solutions.