Updating occurrence probability and size of defect for bored piles

被引:11
作者
Li, D. Q. [2 ]
Tang, W. H. [1 ]
Zhang, L. M. [1 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Civil Engn, Kowloon, Hong Kong, Peoples R China
[2] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
关键词
bored piles; defects; occurrence probability; Bayesian updating; coring examination;
D O I
10.1016/j.strusafe.2006.09.002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
To ensure performance of large-diameter bored piles, integrity tests are often conducted after pile construction. It is often impractical to inspect 100% of piles due to high costs and possible delays. Accordingly, the presence of defects may not be fully detected as only a limited number of piles can be inspected. The defect sizes may also be insufficiently predicted based on limited tests. This paper proposes a procedure to predict the occurrence probability of defect and the defect size for piles at a site based on coring examinations supplemented with engineers' experiences. This procedure is formalized in the Bayesian framework. To update and estimate the occurrence probability and size of pile defects, the concepts of occurrence probability of defect and encounter probability are presented. Then, a method to evaluate the encounter probability is formulated. The occurrence probability of defect is updated based on results from on-site coring. After measurements on encountered defects are taken, the defect size distribution is updated using the proposed procedure. Results from numerical examples indicate that the occurrence probability of defect can be estimated using the proposed procedure in a more rational way. The inspection results from on-site coring have a significant influence on the estimated occurrence probability of defect. The uncertainty in defect size is substantially reduced after being updated with the information on defect sizes from on-site coring. Analysis results can assist the specification of pile inspection program to assure given level of quality assurance. (C) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:130 / 143
页数:14
相关论文
共 28 条
  • [11] Drilled shaft defects: Detection, and effects on capacity in varved clay
    Iskander, M
    Roy, D
    Kelley, S
    Ealy, C
    [J]. JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2003, 129 (12) : 1128 - 1137
  • [12] Kottegoda N.T., 1997, Statistics, Probability, and Reliability for Civil and Environmental Engineers
  • [13] KWONG JS, 2000, P 19 ANN SEM HKIE GE, P231
  • [14] Reliability evaluation of cross-hole sonic logging for bored pile integrity
    Li, DQ
    Zhang, LM
    Tang, WH
    [J]. JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2005, 131 (09) : 1130 - 1138
  • [15] *MIN CONSTR, 2003, TECHN COD TEST BUILD
  • [16] Response of drilled shafts with minor flaws to axial and lateral loads
    O'Neill, M
    Tabsh, SW
    Sarhan, H
    [J]. ENGINEERING STRUCTURES, 2003, 25 (01) : 47 - 56
  • [17] O'Neill M. W., 1999, FHWA-IF-99-025
  • [18] O'Neill MW, 2004, GEOTECH SP, P166
  • [19] PREISS K, 1981, STAT CONSIDERATION T
  • [20] Samman M., 1997, CONCR INT, V19, P49