A Risk-Based Approach for Transmission Network Expansion Planning Under Deliberate Outages

被引:52
作者
Manuel Arroyo, Jose [1 ]
Alguacil, Natalia [1 ]
Carrion, Miguel [1 ]
机构
[1] Univ Castilla La Mancha, E-13071 Ciudad Real, Spain
关键词
Deliberate outages; minimax weighted regret; mixed-integer linear programming; risk; transmission network expansion planning; PROBABILISTIC CHOICE; SECURITY; REGRET;
D O I
10.1109/TPWRS.2010.2042310
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a risk-based approach for the transmission network expansion problem under deliberate outages. Malicious attacks expose network planners to a new challenge: how to expand and reinforce the transmission network so that the vulnerability against intentional attacks is mitigated while meeting budgetary limits. Within this framework network planners face the nonrandom uncertainty of deliberate outages. Unlike in previous approaches, the risk associated with this uncertainty is explicitly addressed in the proposed model. Risk characterization is implemented through the minimax weighted regret paradigm. The resulting mixed-integer nonlinear programming formulation is transformed into an equivalent mixed-integer linear programming problem for which efficient commercial solvers are available. Numerical results illustrate the performance of the proposed methodology. The risk-based expansion plans are compared with those achieved by a previously reported risk-neutral model. An out-of-sample assessment is carried out to show the advantages of the risk-based model over the risk-neutral approach. In addition, the tradeoff between risk mitigation and cost minimization is analyzed.
引用
收藏
页码:1759 / 1766
页数:8
相关论文
共 22 条
[1]   Transmission network expansion planning under deliberate outages [J].
Alguacil, Natalia ;
Carrion, Miguel ;
Manuel Arroyo, Jose .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2009, 31 (09) :553-561
[2]  
[Anonymous], 2009, ILOG CPLEX
[3]   On the solution of the bilevel programming formulation of the terrorist threat problem [J].
Arroyo, JM ;
Galiana, FD .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :789-797
[4]   REGRET IN DECISION-MAKING UNDER UNCERTAINTY [J].
BELL, DE .
OPERATIONS RESEARCH, 1982, 30 (05) :961-981
[5]   Network planning in unbundled power systems [J].
Buygi, Majid Oloomi ;
Shanechi, Hasan Modir ;
Balzer, Gerd ;
Shahidehpour, Mohammad ;
Pariz, Nasser .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (03) :1379-1387
[6]   Market-based transmission expansion planning [J].
Buygi, MO ;
Balzer, G ;
Shanechi, HM ;
Shahidehpour, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (04) :2060-2067
[7]   Vulnerability-constrained transmission expansion planning:: A stochastic programming approach [J].
Carrion, Miguel ;
Arroyo, Jose Manuel ;
Alguacil, Natalia .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) :1436-1445
[8]   Deregulation, privatization, and competition: Transmission planning under uncertainty [J].
De la Torre, T ;
Feltes, JW ;
San Roman, TG ;
Merrill, HM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (02) :460-465
[9]   A new strategy for transmission expansion in competitive electricity markets [J].
Fang, RS ;
Hill, DJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (01) :374-380
[10]  
Floudas C. A., 1995, NONLINEAR MIXED INTE, P245