Network partitioning strategy for parallel power system restoration

被引:45
作者
Sun, Lei [1 ]
Zhang, Can [1 ]
Lin, Zhenzhi [1 ]
Wen, Fushuan [1 ,2 ]
Xue, Yusheng [3 ]
Salam, Md. Abdus [2 ]
Ang, Swee Peng [2 ]
机构
[1] Zhejiang Univ, Sch Elect Engn, Hangzhou 310027, Zhejiang, Peoples R China
[2] Univ Teknol Brunei, Dept Elect & Elect Engn, BE-1410 Bandar Seri Begawan, Brunei
[3] State Grid Elect Power Res Inst, Nanjing 210003, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
METHODOLOGY; GRAPHS;
D O I
10.1049/iet-gtd.2015.1082
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Parallel restoration is an efficient way to speed up the restoration process after a wide-area outage or a complete blackout of a power system. To implement efficient parallel restoration, an appropriate network partitioning method is necessary. Given this background, a two-step network partitioning strategy for parallel power system restoration is presented. In order to minimise the restoration time of generating units, a grouping model for non-black-start units is developed first. Based on the graph theory, a power network partitioning model is presented with the objectives of minimising the number of the interconnected lines and maximising the electrical distance of the interconnected lines among different restoration subsystems. The well-established AMPL/CPLEX is employed to solve the developed optimisation models. Finally, the IEEE New England 10-unit 39-bus system and a part of Zhejiang provincial power system in China are employed to illustrate the feasibility and effectiveness of the developed models.
引用
收藏
页码:1883 / 1892
页数:10
相关论文
共 29 条
[1]   OVERVOLTAGE CONTROL DURING RESTORATION [J].
ADIBI, MM ;
ALEXANDER, RW ;
AVRAMOVIC, B .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (04) :1464-1470
[2]   POWER-SYSTEM RESTORATION PLANNING [J].
ADIBI, MM ;
FINK, LH .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1994, 9 (01) :22-28
[3]   Estimating restoration duration [J].
Adibi, MM ;
Milanicz, DP .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (04) :1493-1498
[4]   Frequency response of prime movers during restoration [J].
Adibi, MM ;
Borkoski, JN ;
Kafka, RJ ;
Volkmann, TL .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (02) :751-756
[5]  
Afrakhte H, 2009, IRAN J SCI TECHNOL B, V33, P463
[6]  
[Anonymous], 1987, IEEE T POWER SYST, V2, P271
[7]  
[Anonymous], 1987, IEEE Transactions on Power Systems, VPWRS-2, P927
[8]  
[Anonymous], 2010, PUMPED STORAGE HYDRO
[9]   FROM GENERIC RESTORATION ACTIONS TO SPECIFIC RESTORATION STRATEGIES [J].
FINK, LH ;
LIOU, KL ;
LIU, CC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (02) :745-751
[10]   Graph partitioning models for parallel computing [J].
Hendrickson, B ;
Kolda, TG .
PARALLEL COMPUTING, 2000, 26 (12) :1519-1534