Operating experience and reliability improvements on the 5 kW CW klystron at Jefferson Lab

被引:0
|
作者
Nelson, R [1 ]
Holben, S [1 ]
机构
[1] Thomas Jefferson Natl Accelerator Facil, Newport News, VA 23606 USA
来源
PROCEEDINGS OF THE 1997 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-3: PLENARY AND SPECIAL SESSIONS ACCELERATORS AND STORAGE RINGS - BEAM DYNAMICS, INSTRUMENTATION, AND CONTROLS | 1998年
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
With substantial operating hours on the RF system, considerable information on reliability of the 5 kW CW klystrons has been obtained. High early failure rates led to examination of the operating conditions and failure modes. Internal ceramic contamination caused premature failure of gun potting material and ultimate tube demise through arcing or ceramic fracture. A planned course of repotting and reconditioning of approximately 300 klystrons, plus careful attention to operating conditions and periodic analysis of operational data, has substantially reduced the failure rate. It is anticipated that implementation of planned supplemental monitoring systems for the klystrons will allow most catastrophic failures to be avoided. By predicting end of life, tubes can be changed out before they fail, thus minimizing unplanned downtime. Initial tests have also been conducted on this same klystron operated at higher voltages with resultant higher output power. The outcome of these tests will provide information to be considered for future upgrades to the accelerator.
引用
收藏
页码:3165 / 3167
页数:3
相关论文
共 2 条
  • [1] Operating experience with superconducting cavities at Jefferson Lab
    Reece, CE
    PARTICLE ACCELERATORS, 1998, 60 (1-4): : 43 - 52
  • [2] Test result of 5 GHz, 500 kW CW prototype klystron for KSTAR LHCD system
    Do, H.
    Park, S.
    Jeong, J. H.
    Bae, Y. S.
    Yang, H. L.
    Delpech, L.
    Magne, R.
    Hoang, G. T.
    Park, H.
    Cho, M. H.
    Namkung, W.
    FUSION ENGINEERING AND DESIGN, 2011, 86 (6-8) : 992 - 995