Identification of production performance criteria in shipbuilding industry

被引:0
作者
Saracoglu, Burak Omer [1 ]
Gozlu, Sitki [2 ]
机构
[1] Turk Loydu Vakfi Iktisadi Isletmesi, Istanbul, Turkey
[2] Istanbul Tech Univ, Fac Management, Istanbul, Turkey
来源
PROCEEDINGS OF THE SEVENTEENTH (2007) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL 1- 4, PROCEEDINGS | 2007年
关键词
shipyard; shipbuilding; performance criteria; graphical model; decision; selection; production;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The objective of this paper is to identify the shipbuilding production performance criteria. The necessary information was gathered from a case study, which concluded with a graphical model. The pure shipbuilding production performance has three dimensions such as hull, outfitting, and painting. Each point on the space demonstrates the criteria satisfaction value. The total pure performance is represented by a surface. It has been determined that there are two different types of performance criteria illustrated either as shadow or clear. The presented graphical model is one of the most appropriate ways to represent the pure production performance of a shipyard that can be used for comparing projects or different yards.
引用
收藏
页码:3746 / +
页数:3
相关论文
共 64 条