Knowledge-based schedule generation and evaluation

被引:56
作者
Mikulakova, Eva [1 ]
Konig, Markus [2 ]
Tauscher, Eike [3 ]
Beucke, Karl [3 ]
机构
[1] Bauhaus Univ Weimar, Dept Civil Engn, D-99423 Weimar, Germany
[2] Ruhr Univ Bochum, Dept Civil & Environm Engn, D-44780 Bochum, Germany
[3] Bauhaus Univ Weimar, Dept Civil Engn, D-99423 Weimar, Germany
关键词
Automated scheduling; Case-Based Reasoning (CBR); Construction alternative; Building information; Industry Foundation Classes (IFC); Schedule evaluation; MANAGEMENT; FRAMEWORK; DESIGN; MODEL; CAD;
D O I
10.1016/j.aei.2010.06.010
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The straightforward and effective realization of construction projects is heavily dependent upon the planning of the construction process and the response to project modifications during the construction phase Construction-process planning is one of the most important requirements for a satisfactory result, but it is often not given sufficient consideration. The construction planning usually involves great amount of process steps and is developed by the processing of many project participants The construction-planning steps range from planning of building design and creation of construction drawings up to the generation of schedules for the realization of the planned building. These steps are often executed without overall coordination and reiteratively The planning process becomes error prone and thus results in inaccurate schedules. The planned construction process must then be operational adapted at the construction site These drawbacks are mainly produced during the manual creation of schedules that is based on no current or insufficient information. Moreover, due to the complexity of the planning task in the domain of construction planning the manually generated schedules are often imprecise Furthermore, schedules are not updated when project conditions change. In such situations, project managers balance the available possibilities and intuitively choose one construction alternative for the realization During this process many factors are often taken into account insufficiently or not at all In addition, the project managers are wasting their resources generating new schedules for recurring situations that are similar to already executed projects In consequence, the project experience becomes personal and is not available for other project participants. To eliminate these drawbacks, a knowledge-based approach for the automatic generation of schedules and their evaluation is presented in this paper using the building information for identification of the scheduling subject. With the support of the system, construction schedules can moreover be re-generated flexibly, each time a project is modified, considering the current execution alternatives. All learned experience is stored within a reasoning system for further reuse. Using a decision-support system, construction alternatives can be evaluated considering all relevant factors and the best alternative for the realization can be proposed. (C) 2010 Elsevier Ltd All rights reserved
引用
收藏
页码:389 / 403
页数:15
相关论文
共 51 条
[1]  
AAMODT A, 1994, AI COMMUN, V7, P39
[2]  
[Anonymous], 2007, Comput. Civ. Eng.
[3]  
BECK JC, 1998, AL MAG, V4, P103
[4]   Monitoring bridge health using fuzzy case-based reasoning [J].
Cheng, Y ;
Melhem, HG .
ADVANCED ENGINEERING INFORMATICS, 2005, 19 (04) :299-315
[5]  
CHERNEFF J, 1991, J COMPUT CIVIL ENG, V5, P64
[6]  
CHEUNG SO, 2001, CONSTRUCT MANAGE EC, V19, P4427
[7]   Case-based reasoning approach in bid decision making [J].
Chua, DKH ;
Li, DZ ;
Chan, WT .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (01) :35-45
[8]   Generation of a construction planning from a 3D CAD model [J].
de Vries, Bauke ;
Harink, Jeroen M. J. .
AUTOMATION IN CONSTRUCTION, 2007, 16 (01) :13-18
[9]   Product modelling to support case-based construction planning and scheduling [J].
Dzeng, RJ ;
Tommelein, ID .
AUTOMATION IN CONSTRUCTION, 2004, 13 (03) :341-360
[10]   Critiquing contractors' scheduling by integrating rule-based and case-based reasoning [J].
Dzeng, RJ ;
Lee, HY .