Modelling of different measures for improving removal in a storm pond

被引:9
作者
German, J [1 ]
Jansons, K
Svensson, G
Karlsson, D
Gustafsson, LG
机构
[1] Chalmers Univ Technol, Dept Civil & Environm Engn, SE-41296 Gothenburg, Sweden
[2] Univ Queensland, Div Environm, Sch Engn, Brisbane, Qld 4072, Australia
[3] DHI Water & Environm, SE-41104 Gothenburg, Sweden
关键词
compartmental modelling; numerical model; removal efficiency; retrofitting; stormwater pond;
D O I
10.2166/wst.2005.0120
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The effect of retrofitting an existing pond on removal efficiency and hydraulic performance was modelled using the commercial software Mike21 and compartmental modelling. The Mike21 model had previously been calibrated on the studied pond. Installation of baffles, the addition of culverts under a causeway and removal of an existing island were all studied as possible improvement measures in the pond. The subsequent effect on hydraulic performance and removal of. suspended solids was then evaluated. Copper, cadmium, BOD, nitrogen and phosphorus removal were,also investigated for that specific improvement measure showing the best results. Outcomes of this study reveal that all measures increase the removal efficiency of suspended solids. The hydraulic efficiency is improved for all cases, except for the case where the island is removed. Compartmental modelling was also used to evaluate hydraulic performance and facilitated a better understanding of the way each of the different measures affected the flow pattern and performance. It was concluded that the installation of baffles is the best of the studied measures resulting in a reduction in the annual load on the receiving lake by approximately 8,000 kg of suspended solids (25% reduction of the annual load), 2 kg of copper (10% reduction of the annual load) and 600 kg of BOD (10% reduction of the annual load).
引用
收藏
页码:105 / 112
页数:8
相关论文
共 23 条
[1]  
ADAMSSON A, 1999, P 8 INT C URB STORM, P1175
[2]  
Anderson BC, 2002, WATER SCI TECHNOL, V45, P277
[3]  
[Anonymous], [No title captured]
[4]  
[Anonymous], [No title captured]
[5]  
Chow V.T., 1959, Open Channel Hydraulics
[6]   Storm water pollutant removal by two wet ponds in Bellevue, Washington [J].
Comings, KJ ;
Booth, DB ;
Horner, RR .
JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 2000, 126 (04) :321-330
[7]  
*DHI, 2004, 21 DHI MIKE
[8]   Modelling of temperature effects on removal efficiency and dissolved oxygen concentrations in stormwater ponds [J].
German, J ;
Svensson, G ;
Gustafsson, LG ;
Vikström, M .
WATER SCIENCE AND TECHNOLOGY, 2003, 48 (09) :145-154
[9]  
GERMAN J, 2002, P 9 INT C URB DRAIN
[10]  
GERMAN J, 2003, THESIS CHALMERS U TE