BIM-based energy and acoustic analysis through CVE tools

被引:16
|
作者
Susnik, Mija [1 ]
Tagliabue, Lavinia Chiara [2 ]
Cairoli, Maria [3 ]
机构
[1] Politecn Milan, Piazza Leonardo Vinci 32, I-20133 Milan, Italy
[2] Univ Turin, Dept Comp Sci, Corso Svizzera 185, I-10149 Turin, Italy
[3] Politecn Milan, Dept Energy, Piazza Leonardo Vinci 32, I-20133 Milan, Italy
关键词
BIM; Interoperability; Energy analysis; Acoustic analysis; Dynamo; Revit; ENVIRONMENTAL-QUALITY; DATA-MANAGEMENT; PERFORMANCE; VISUALIZATION; COMFORT; SYSTEM;
D O I
10.1016/j.egyr.2021.06.013
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Building information modelling (BIM) is trying to overcome the issue of interoperability by promoting the collaboration between different professions, which enables Building Performance Assessments (BPA) to take place earlier in the design process. Nevertheless, the interoperability is rarely perfect and information is lost during translation from BIM authoring tool to simulation software or the interoperability is limited to the translation of the geometry. The discrepancies in data translations from BIM authoring tool to specific Calculation Virtual Environments (CVE) for energy and acoustic evaluation are considered. For the energy performance evaluation two software tools are tested in the present research paper, namely the Design Builder and IES VE , using IFC and gbXML as data exchange formats. Furthermore, a solution is proposed for overcoming the interoperability issue about acoustic evaluation by adapting programming language in Dynamo Graphical Interface for calculation of acoustic parameters, namely the Reverberation time and Schroeder's frequency, which allow room quality evaluation to take place earlier in the design process as they are crucial for educational and other facility usage buildings. (C) 2021 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:8228 / 8237
页数:10
相关论文
共 50 条
  • [1] BIM-based method to inform operation and maintenance phases through a simplified procedure
    Condotta, Massimiliano
    Scanagatta, Chiara
    JOURNAL OF BUILDING ENGINEERING, 2023, 65
  • [2] Exploring and verifying BIM-based energy simulation for building operations
    Li, Hong Xian
    Ma, Zhiliang
    Liu, Hexu
    Wang, Jun
    Al-Hussein, Mohamed
    Mills, Anthony
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (08) : 1679 - 1702
  • [3] BIM-BASED REVERBERATION TIME ANALYSIS
    Nik-Bakht, Mazdak
    Lee, Joonhee
    Dehkordi, Soheil Hadian
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2021, 26 : 28 - 38
  • [4] BIM-based simulation tools for occupant evacuation: a scoping review
    Akbar, Abdullah Ehtesham
    Hassanain, Mohammad A. A.
    FACILITIES, 2023, 41 (9/10) : 623 - 645
  • [5] BIM-based energy consumption analysis for residential buildings: effects of orientation, size, and type of windows
    Pradnya Jadhav
    Pravin Minde
    Discover Civil Engineering, 1 (1):
  • [6] BIM-based LCA and energy analysis for optimised sustainable building design in Ghana
    Kofi A. B. Asare
    Kirti D. Ruikar
    Mariangela Zanni
    Robby Soetanto
    SN Applied Sciences, 2020, 2
  • [7] Bim-based energy analysis and optimization using insight 360 (case study)
    Maglad, Ahmed M.
    Houda, Moustafa
    Alrowais, Raid
    Khan, Abdul Mateen
    Jameel, Mohammed
    Rehman, Sardar Kashif Ur
    Khan, Hamza
    Javed, Muhammad Faisal
    Rehman, Muhammad Faisal
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2023, 18
  • [8] BIM-based LCA and energy analysis for optimised sustainable building design in Ghana
    Asare, Kofi A. B.
    Ruikar, Kirti D.
    Zanni, Mariangela
    Soetanto, Robby
    SN APPLIED SCIENCES, 2020, 2 (11):
  • [9] Case Study of BIM-Based Building Energy Evaluation
    Zhang, Runmei
    Liu, Changcheng
    Xu, Tao
    LTLGB 2012: PROCEEDINGS OF INTERNATIONAL CONFERENCE ON LOW-CARBON TRANSPORTATION AND LOGISTICS, AND GREEN BUILDINGS. VOL 1, 2013, : 787 - 798
  • [10] Sustainable BIM-based Evaluation of Buildings
    Motawa, Ibrahim
    Carter, Kate
    SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 419 - 428