Large-scale experimental verification of semiactive control through real-time hybrid simulation

被引:144
作者
Christenson, Richard [1 ]
Lin, Yi Zhong [1 ]
Emmons, Andrew [2 ]
Bass, Brent [3 ]
机构
[1] Univ Connecticut, Dept Civil & Environm Engn, Storrs, CT 06269 USA
[2] Martin Martin Consulting Engineers, Lakewood, CO 80215 USA
[3] Simpson Gumpertz & Heger Inc, Waltham, MA 02453 USA
关键词
D O I
10.1061/(ASCE)0733-9445(2008)134:4(522)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Magneto-rheological (MR) fluid dampers have been identified as a particularly promising type of semiactive control device for hazard mitigation in civil engineering structures. Large-scale experimental testing is important to verify the performance of MR fluid dampers for seismic protection of civil structures. Real-time hybrid testing, where only the critical components of the system are physically tested while the rest of the structure is simulated, can provide a cost-effective means for large-scale testing of semiactive controlled structures. This paper describes the real-time hybrid simulation experimental setup for multiple large-scale MR fluid dampers and demonstrates the capability at the University of Colorado at Boulder shared-use Fast Hybrid Test facility to conduct real-time hybrid testing within the Network for Earthquake Engineering Simulation.
引用
收藏
页码:522 / 534
页数:13
相关论文
共 50 条
[21]   Experimental evaluation of the seismic performance of steel MRFs with compressed elastomer dampers using large-scale real-time hybrid simulation [J].
Karavasilis, Theodore L. ;
Ricles, James M. ;
Sause, Richard ;
Chen, Cheng .
ENGINEERING STRUCTURES, 2011, 33 (06) :1859-1869
[22]   Rigid Body Interaction for Large-Scale Real-Time Water Simulation [J].
Kellomaki, Timo .
INTERNATIONAL JOURNAL OF COMPUTER GAMES TECHNOLOGY, 2014, 2014
[23]   Experimental verification of an accessible geographically distributed real-time hybrid simulation platform [J].
Ozdagli, Ali Irmak ;
Xi, Wang ;
Ou, Gaby ;
Li, Bo ;
Dyke, Shirley J. ;
Wu, Bin ;
Zhang, Jian ;
Yong, Ding ;
Xu, Guoshan ;
Wang, Tao .
STRUCTURAL CONTROL & HEALTH MONITORING, 2020, 27 (02)
[24]   Heterogeneous architecture and testbed for simulation of large-scale real-time systems [J].
Mathuré, MA ;
Jonnalagadda, V ;
Zalewski, J .
SEVENTH IEEE INTERNATIONAL SYMPOSIUM ON DISTRIBUTED SIMULATION AND REAL-TIME APPLICATIONS, PROCEEDINGS, 2003, :37-42
[25]   Simplification and Initialization of Large-scale Induction Motor in Real-time Simulation [J].
Liu C. ;
Zhu Y. ;
Guo Q. ;
Hu T. ;
Wang W. ;
Wang F. ;
Chen X. .
Dianwang Jishu/Power System Technology, 2022, 46 (01) :404-411
[26]   Automatic Optimization for Large-Scale Real-Time Coastal Water Simulation [J].
Wang, Shunli ;
Kang, Fengju .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016
[27]   A LARGE-SCALE REAL-TIME NETWORK SIMULATION STUDY USING PRIME [J].
Liu, Jason ;
Li, Yue ;
He, Ying .
PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, :789-798
[28]   Immersive real-time large-scale network simulation: A research summary [J].
Liu, Jason .
2008 IEEE INTERNATIONAL SYMPOSIUM ON PARALLEL & DISTRIBUTED PROCESSING, VOLS 1-8, 2008, :2573-2577
[29]   Study on real-time simulation technology of large-scale virtual scene [J].
Zhu, LF ;
Shao, Y ;
Fan, XT ;
Guo, HD .
IGARSS 2003: IEEE INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM, VOLS I - VII, PROCEEDINGS: LEARNING FROM EARTH'S SHAPES AND SIZES, 2003, :3934-3936
[30]   New advances in large-scale distributed simulation and real-time applications [J].
Moretti Annoni Notare, Mirela Sechi .
CONCURRENCY AND COMPUTATION-PRACTICE & EXPERIENCE, 2016, 28 (12) :3257-3259